LumenTruss 8870 Profile

LumenTruss 8870 Profile

Nov 3, 2020

The new 8870 profile is designed to disappear into the structure so that the light source merges with the surface.

The LED trays are perfectly smooth and allow the installation of two strip tapes (5.9 W/ft) side by side for maximum lighting power, or face to face for optimal light diffusion. A new feature: it can be used with all type B joiners to build a solid structure, and it fits directly with standard gypsum panels for an impeccable finish. Its refined look harmonizes perfectly with any design.

• Available in 96 in (2.43 m) lengths including 2 straight Type B joiners; profile can be cut onsite for easy and accurate installation

• Fits directly over standard 5/8″ gypsum panels; can also accept ½” panels with 1/8″ shims installed onsite

• On each side of the extrusion, the edges have grooves that reduce the space between the screws and the surface

• LED trays designed for two light sources installed sideby-side (5.9 W/ft) for maximum light output or face-to-face for optimal light distribution

• 10 LED light sources to choose from 2400 K to 6200 K, including WarmDim, RGB and RGBW

• Application guide for light sources of 10 mm (0.394″) or less in IP22

• Made of ALCOA 6063T5 aluminum alloy for increased heat dissipation

• Indoor use

Go HERE for more information.

Related Articles


Latest Articles


Changing Scene

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…

  • IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    April 27, 2026 In 2026, IDEAL Electrical will support four global Habitat for Humanity activations across Greater Toronto, Greater Chicago, the United Kingdom and Los Angeles/Southern California. These efforts will bring together IDEAL employees, electricians and apprentices, industry partners and electrical influencers to contribute more than 500 volunteer hours, $100K in materials and invaluable electrical skills Read More…