Arlington SliderBar Boxes

EIN SliderBar 400

March 15, 2021

Arlington’s SLIDERBAR Boxes are ideal for mounting a single or two-gang box between wood or metal studs with non-standard spacing.

Arlington’s SL18 steel SLIDERBAR looks great and saves about 20 minutes per box over cutting and nailing extra 2x4s. It’s adjustable to fit between studs spaced 12 to 18 inches apart, and allows you to position one or multiple boxes where you need them in the stud cavity.

Pre-formed pilot holes in the bar make for easy attachment of steel box(es). SLIDERBAR also features an interlocking tab stop that prevents accidental disassembly.

‘Bending’ guides on bracket ends assure proper positioning on studs

SLIDERBAR and boxes sold separately – SLIDERBAR/Box Kits include a single or two gang plastic box

Plastic boxes rated for NM Cable, NMB-PCS and NMD90 in Canada

When using a metal box SLIDERBAR is rated for non-metallic as well as MC, AC and FMC cable

Go HERE for more information

 

 

Related Articles


Latest Articles


Changing Scene

  • CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    May 1, 2026 CAF-FCA welcomes the federal government’s strong focus on skilled trades in the 2026 Spring Economic Update, including new investments in apprenticeship pathways, financial supports, and employer incentives. These measures reflect long standing priorities advanced by employers and partners across the country. The Canadian Apprenticeship Forum (CAF-FCA) welcomes the Government of Canada’s renewed Read More…

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…