E2 Inc Training: Power System Safety Protection (PSSP) Cat 2 & 3

EIN E2 Inc 400

May 13, 2021

Power System Safety Protection (PSSP) is defined as the required constraints applied to the power system to provide worker protection from power system hazards during prescribed work. All personnel required to access or work on the power system must be authorized. There are five categories of PSSP authorization based on the hazards and complexity of the associated work. E2 Inc. offers training for the following categories:

CATEGORY 2

This course is the System Component training that is required for authorization to either:

  • Power System Safety Protection (PSSP) Category 2
  • Worker Protection Practices (WPP) Category A
  • The desired outcome of this course is that you will fully understand both the hazards you may encounter at BC Hydro facilities and the safety precautions you must take to avoid injury. Authorization limited to access to the power system (e.g. entering stations, work sites etc.).

CATEGORY 3

  • This course is the part 1 and part 2 of the System Component training required for authorization to:
    • Power System Safety Protection (PSSP) Category 3
    • Worker Protection Practices (WPP) Category B

Authorization limited to work on the power system that does not require a Safety Protection Guarantee except a Protection Extension on the power system under the direction of another crew member who has received a Safety Protection Guarantee, and for some types of work requiring an Assurance of No Reclose Permit.

Cat 2 & 3 Course Schedule:

  • May 19th, 2021
  • June 2nd, 2021
  • June 16th, 2021

Go HERE to register 

Related Articles


Latest Articles


Changing Scene

  • Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    May 12, 2025 Hammond Power Solutions (HPS), a leader in dry-type transformers and power quality solutions, is pleased to announce the appointment of Linda Nadeau Sanford as the new Western Regional Sales Manager. Linda will play a key part in driving sales and revenue across the Western Canada region. She will oversee territory management, advance… Read More…

  • Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    May 12, 2025 Electricity Human Resources Canada (EHRC) is proud to announce Susanna Zagar (she/her), Chief Executive Officer of the Ontario Energy Board (OEB), as the recipient of the 2025 Agent of Change Award. This recognition celebrates Ms. Zagar’s remarkable leadership and commitment to diversity, equity and inclusion (DEI) in the electricity sector. Since stepping… Read More…

  • AD Reports Huge Jump in Member Sales Through Three Months of 2025

    AD Reports Huge Jump in Member Sales Through Three Months of 2025

    May 12, 2025 AD reports that member sales in the first three months of 2025 increased 23% to a record $24 billion across the group’s 14 divisions and three countries. AD welcomed over 550 new members in the first quarter through both organic growth and the IMARK Electrical merger. AD members also acquired another 10… Read More…

  • Legrand Introduces Wattstopper i3 Building Management Platform

    Legrand Introduces Wattstopper i3 Building Management Platform

    May 12, 2025 Legrand® has announced the launch of the Wattstopper i3 Platform, a next-generation lighting and building intelligence solution powered by KODE Labs, a global leader of advanced smart building technology.  The partnership positions Legrand to lead the lighting controls industry into a new era of unified experiences, seamless integrations, and data-driven control, making it easier… Read More…