E2 Inc Training: Power System Safety Protection (PSSP) Cat 2 & 3

EIN E2 Inc 400

May 13, 2021

Power System Safety Protection (PSSP) is defined as the required constraints applied to the power system to provide worker protection from power system hazards during prescribed work. All personnel required to access or work on the power system must be authorized. There are five categories of PSSP authorization based on the hazards and complexity of the associated work. E2 Inc. offers training for the following categories:

CATEGORY 2

This course is the System Component training that is required for authorization to either:

  • Power System Safety Protection (PSSP) Category 2
  • Worker Protection Practices (WPP) Category A
  • The desired outcome of this course is that you will fully understand both the hazards you may encounter at BC Hydro facilities and the safety precautions you must take to avoid injury. Authorization limited to access to the power system (e.g. entering stations, work sites etc.).

CATEGORY 3

  • This course is the part 1 and part 2 of the System Component training required for authorization to:
    • Power System Safety Protection (PSSP) Category 3
    • Worker Protection Practices (WPP) Category B

Authorization limited to work on the power system that does not require a Safety Protection Guarantee except a Protection Extension on the power system under the direction of another crew member who has received a Safety Protection Guarantee, and for some types of work requiring an Assurance of No Reclose Permit.

Cat 2 & 3 Course Schedule:

  • May 19th, 2021
  • June 2nd, 2021
  • June 16th, 2021

Go HERE to register 

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…