Fluence LED Retrofit Guide for Greenhouses

LDS Fluence logo 400

October 15, 2021

Fluence by OSRAM (Fluence), a global provider of energy-efficient LED lighting solutions for commercial cannabis and food production, announced the first of two comprehensive retrofit guides specifically designed to assist cultivators and growers in determining what they need for a complete, seamless retrofitting process. The first guide, Greenhouse LED Retrofit Guide, outlines tips and tricks for greenhouse operators and growers for outlining and optimizing their LED implementation and utilization following a retrofit.

“While more greenhouse operators are realizing the undeniable benefits of LEDs, there is more to a retrofit than simply changing some lights and flipping a switch,” said David Cohen, CEO of Fluence. “Our retrofit guides offer operators the resources, data and guidelines they need to ensure their LED implementation meets their exact greenhouse requirements to maximize crop yield without sacrificing plant quality or energy consumption.”

Greenhouse operators can use the guide to further understand the clear benefits of LEDs, including:

  • Factors affecting an LED system’s return on investment.
  • How LEDs decrease—and increase—energy consumption for lower costs overall.
  • Why LEDs enable increased PPFD throughout the warmer months.
  • How to take the next steps in the analysis of an LED retrofit.

The Greenhouse LED Retrofit Guide also details how operators and growers can properly select an LED spectrum and fixture based on the crop’s cultivation requirements, a region’s energy prices and a team’s overall greenhouse goals.

“We want operators and growers to know that retrofitting doesn’t have to be a complicated process,” Cohen continued. “We are in the corner of those who undergo the retrofitting process by providing them with a complete, comprehensive guide that details every step in the process. Our Horticulture Services team is also available to work with operators and growers throughout the entire retrofitting process to ensure a smooth and successful implementation.”

The Greenhouse LED Retrofit guide is available for download HERE

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…