UL Partners with InSite to Help Advance Building Intelligence, Technology Integration and Performance

EIN UL InSite

May 19, 2022

UL announced a new partnership with InSite, a provider of building intelligence solutions that enable organizations to optimize performance of real estate assets, achieve sustainability goals and fulfill environmental, social and governance (ESG) reporting requirements.

With this partnership, InSite will provide building owners and property managers with actionable building intelligence data to complement UL’s ESG advisory, sustainability and energy advisory, indoor environmental quality and field services. UL’s advisory services include services such as energy and water audits, commissioning advisory services, sustainability certifications, including Leadership in Energy and Environmental Design (LEED), Building Research Establishment’s Environmental Assessment Method (BREEAM), Fitwel and the WELL Building Standard.

Per the 2020 Global Status Report for Buildings and Construction by GlobalABC, buildings generate nearly 40% of annual global CO2 emissions including 28% from building operations. As part of the UL and InSite combined offering, InSite’s building intelligence platform will support robust reporting and disclosure of ESG and sustainability data to key stakeholders such as GRESB. UL will leverage InSite’s extensive data integration capabilities and operational insights to provide relevant advisory expertise, such as carbon accounting and net-zero carbon emissions.

ESG reporting for a building encompasses a variety of environmental metrics. According to the 2020 United Nations Global Status Report for Buildings and Construction, the operations of buildings contribute to 28% of total global energy-related carbon dioxide emissions. In addition to greenhouse gas emissions, other environmental factors should be considered for ESG reporting, including energy use, water consumption, solid waste and biodiversity.

“The commercial real estate industry has prioritized formulating building performance and ESG data as well as related reporting standards as part of overall property management operations,” said Sean McCrady, global director of UL’s Asset and Sustainability Performance group. “UL’s new partnership with InSite will allow us to serve customers with an end-to-end technology and advisory solution to help inform these critical business decisions, including asset allocation, property management company selection and overall investment strategies.”

“We are extremely excited about our new partnership with UL and the positive impact it will have on our customers. This partnership allows us to continue monitoring and reporting building performance, sustainability and ESG data while enriching and elevating our clients’ sustainability journeys with UL’s industry-leading advisory,” said Francis Gangemi, InSite’s president. 

Source

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…