The Code is a comprehensive document. Sometimes it can seem quite daunting to find the information you need quickly. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook** but will hopefully provide some help in navigating the Code.

Section 80 — Cathodic Protection – (The 25th Edition of the CE-C, Part I, (C22.1-21) * is available from CSA Group. This discussion of Section 80 is based on this edition).

Rule 80-000 notes that this is a supplementary or amendatory section of the code and applies only to the installation of impressed current cathodic protection systems. Appendix B and the CEC Handbook have additional information and descriptions of Cathodic Protection. This Section considers that the wiring methods used in installing such systems are sometimes inconsistent with the requirements of other Sections of the Code.

Rule 80-002 mandates the wiring methods for DC wiring and includes:

  • conformance to Section 12requirements, except when buried below ground of not less than 450mm or 200mm when in a raceway or with mechanical protection, and
  • conformance to Section 18 and Section 20whenin hazardous areas.

Where DC wiring is installed underground below a Section 20 (Annex J20) Class I hazardous area, it may be buried to a depth not less than 450 mm or 200mm in threaded rigid conduit and sealed in accordance with Rules 18-104 or 18-154, where it emerges from the ground.

Rule 80-004 requires that DC cathodic protection wiring be a minimum No. 12 AWG, except for instrumentation and reference electrode leads, and be selected in accordance with Rule 12-102 3) regarding location and conditions of use.

Rule 80-006 specifies that splices, taps and connections made in conductors underground or exposed to the weather must be:

  • made by welding, by a positive compression tool, by crimping and soldering, or by means of a copper, bronze, or brass cable connector.
  • sealed against moisture by taping or other methods as effective as the original insulation.
  • connected to piping by thermit welding or by a clamp of the same material as the piping or anodic to it;
  • connected to a tank or other structure with a welded stud, thermit welding or other permanent means; and
  • sealed against moisture by applying a material resistant to any corrosive environment.

Rule 80-008 requires that the cathodic protection system rectifier be provided with a dedicated circuit in accordance with the requirements of Section 12.

Rule 80-010 outlines that each rectifier unit of a cathodic protection system must have a separate disconnecting means installed that is:

  • readily accessible,
  • within sight of, and
  • within 15 m of the unit, or
  • integral to the rectifier and equipped with:
  • barriers or other suitable means to protect service personnel from live parts on the line side, and
  • rendered inaccessible to unauthorized persons by a lockable cover, and
  • labelled in a conspicuous, legible, and permanent manner identifying it as the disconnecting means for a cathodic protection system.

Rule 80-012 requires that where the available operating voltage is more than 50V:

  • the voltage difference between exposed points of the protected system, or
  • any point in the vicinity of the anodes, and any point 1m away on the earth’s surface, not exceed 10V.

Rule 80-014 requires that the following warning signs and drawings be provided:

  • A marking warning on tanks, pipes and structures that the cathodic protection system is not to be disconnected unless the power source is turned off.
  • A sign, in a conspicuous location adjacent to the disconnecting means of electrical apparatus connected to the cathodically protected structures, advising that the cathodic protection be turned off and a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, be installed before equipment or piping is replaced or modified.
  • In a non-hazardous location, a sign advising that the use of a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, may be used as an alternative to turning off the cathodic protection when replacing or modifying the protected equipment.
  • A drawing, placed inside or near the rectifier cabinet, showing the location, polarity and anodes of underground cathodic protection wiring.
  • A notice, placed in a conspicuous location adjacent to the entranceway of a storage or process container, advising that the cathodic protection system must be turned off before entering the container.

In the next installment, we will discuss Section 84 – Interconnection of Electric Power Production Sources.

Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727. [1]

William (Bill) Burr is an associate member of the Canadian Electrical Code, Part 1, Technical Committee and formerly Chair of the Canadian Advisory Council on Electrical Safety (CACES), Chief Electrical and Elevator Inspector for the Province of BC & the Northwest Territories, Director of Electrical and Gas Standards Development and Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…

  • Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    Goal Zero YETI 3000X Power Stations Recalled due to Fire and Burn Hazards

    September 16, 2026 This recall involves Goal Zero YETI 3000X power stations. The silver and black portable power stations measure about 62 centimetres (24.4 inches) high, 47 centimetres (18.5 inches) wide, 57 centimetres (22.3 inches) deep and weigh approximately 42 kilograms (92 pounds). The power stations have yellow handles and a digital display at the… Read More…


Changing Scene

  • Innovair Solutions Acquires TRM Heating Cables

    Innovair Solutions Acquires TRM Heating Cables

    September 18, 2026 Innovair Solutions has announced the acquisition of TRM Heating Cables, a Toronto-based Canadian company specializing in heating cables for commercial and industrial applications. Founded in 2001, TRM has built strong technical expertise in the sale and installation of specialized products, including self-regulating cables, mineral-insulated cables and electric floor heating systems. The company… Read More…

  • Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    Electrical Safety Authority Honours Leaders Helping Build a Safer, More Electrified Future

    September 17, 2026 From preparing the next generation of skilled workers to supporting one of the world’s largest sporting events, this year’s recipients demonstrate how electrical safety supports Ontario’s future As Ontario electrifies homes, transportation and industry, the Electrical Safety Authority (ESA) has recognized the organizations and individuals helping ensure safety keeps pace with that… Read More…

  • NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    NERVA Energy to Support Deep Energy Retrofits Across Selected Morguard Properties

    September 17, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $100 million loan with Morguard Corporation to enable energy‑efficient retrofits across a portfolio of approximately 30 properties in Canada. Morguard is a fully integrated real estate firm with more than $24.2 billion in assets under management across North America. Morguard will collaborate… Read More…

  • Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    Government of Canada Welcomes Major New Investment in Sovereign AI Infrastructure in Saskatchewan

    September 16, 2026 New Canadian-led infrastructure project will help build secure and reliable computing capacity responsibly On September 14, 2026, the Government of Canada welcomed Bell Canada’s planned investment to expand its Bell AI Fabric capacity in Saskatchewan, an important step toward building the sovereign computing capacity Canada needs to compete and succeed in the… Read More…