Electrical Box Cutting Kit, Double Gang

February 28, 2024

Featuring our EBC-800 Double Gang Electrical Wall Box Cutter and our WTL-12 Wall Template & Level, the EBW-812 is the essential kit for installing double gang electrical wall boxes. This kit features the following:

  • WTL-12 Wall Box Template & Level for Non-Metallic Boxes, 1-Gang and 2-Gang: has built-in levels and a rubber backing to allow you to position the template exactly where you need it. Compatible with: Carlon B114R & B12R single gang boxes, Carlon B225R double gang boxes, Carlon SC100RR low voltage plates, Arlington Industries LVL1 and LVL2 boxes, and many other brands of non-metallic single and double gang boxes
  • When used with a multitool, EBC-800 cuts drywall in just seconds to make installation of electrical boxes quick and easy
  • Can be used for the installation of plastic, metal, or low voltage existing construction electrical boxes (4″ x 3 3/4″)
  • Needs to be used with an oscillating multi-tool (sold separately), and fits most industry-standard multi-tool power tools

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    May 1, 2026 CAF-FCA welcomes the federal government’s strong focus on skilled trades in the 2026 Spring Economic Update, including new investments in apprenticeship pathways, financial supports, and employer incentives. These measures reflect long standing priorities advanced by employers and partners across the country. The Canadian Apprenticeship Forum (CAF-FCA) welcomes the Government of Canada’s renewed Read More…

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…