Liteline PrecisionPro

July 2, 2024

A-Line has partnered with an industry leader in drywall fabrication, to offer a program that provides the flawless trimless look that you desire while minimizing concerns surrounding installation. Fixtures are not always designed for easy installation into drywall. PrecisionPro reduces the amount of manual labor required by providing a high-quality custom drywall panel for downlights and a channel for track that installs like any sheet of drywall.

Manufactured in a climate-controlled drywall factory, trimless products can now be specified with a PrecisionPro Drywall panel for downlights, or channel for track. With the same installation process as regular drywall, these panels/channels have sloped edges to ensure there is a seamless finish when feathering the mudding. Channels can be joined together to accommodate long runs of track.

Screw into building’s frame
Line up remaining drywall
PrecisionPro
Tape and mud edge for a seamless finish

PrecisionPro Solutions

  • No need to worry about cutting a hole. Simply screw to the building frame, tape and mud to other drywall sheets for a seamless finish
  • Reduce intensive labor & costs
  • Sleek finish with minimal effort
  • Level 5 finish
  • Easier to line up
  • Does not require expert level drywall skills

Go HERE for more information

      Related Articles


      Latest Articles

      • EFC Letter on China Tariffs

        EFC Letter on China Tariffs

        September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

      • Changing How we Build Homes: A Year of the Housing Accelerator Fund

        Changing How we Build Homes: A Year of the Housing Accelerator Fund

        September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

      • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

        Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

        September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

      • B.C. Building Code Updated to Support More Homes

        B.C. Building Code Updated to Support More Homes

        September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


      Changing Scene

      • Leviton Canada Achieves Another Year of Carbon Neutrality

        Leviton Canada Achieves Another Year of Carbon Neutrality

        September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

      • Grand Opening: Legrand BCS Office in Markham

        Grand Opening: Legrand BCS Office in Markham

        September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

      • Gescan Announces Partnership with PataBid

        Gescan Announces Partnership with PataBid

        September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

      • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

        Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

        September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…