Cementex Announces the MRT-18-LED Rechargeable Magnetic Retrieving Tool

July 18, 2024

Cementex announces the MRT-18-LED, a rechargeable LED light up magnetic retrieving tool. This tool strengthens electric safety work practices by illuminating the exact location of a lost screw, nut, or tool that might have fallen inside a panel. By doing so, it eliminates the need for professionals to carry a light on their heads, in their mouths, or in their hands.

The MRT-18-LED features an 18” flexible shaft that combines a strong magnetized tip with a rechargeable LED light at the tip. The product is rated, such that it can be used anywhere with its 1000VAC/ 1500VDC rating. This flexibility combined with its rating allows the product to be used in a wide range of projects that require enhanced safety measures.

The light provides a well-balanced beam with a 5-sided glowing CSP LED that easily twists off and on. It also offers a wide range of brightness levels that can be calibrated to fit the needs of a specific project. Its maximum output is 150 lumens, which runs for 15 minutes before falling to 50% of charge, while its minimum output is 5 lumens, which runs for 6 hours before dropping to 50% of charge. The product’s insulation cap and magnet tip are removable to allow a full recharge in 75 minutes via a micro-USB charger port.

Go HERE for more information

Related Articles


Latest Articles

  • EFC Supporting Industry Amongst Tariff Uncertainty

    EFC Supporting Industry Amongst Tariff Uncertainty

    As a major representative of the electrical and automation industry, Electro Federation Canada remains committed to supporting its members and the industry overall in navigating the complexities of international trade policies. Read More…

  • CanREA Launches New and Improved Go Solar Guide 2025

    CanREA Launches New and Improved Go Solar Guide 2025

    March 21, 2025 The Canadian Renewable Energy Association (CanREA) launched the 2025 edition of its annual Go Solar Guide today, encouraging Canadians to go solar. The 2025 version is new and improved: Now a web portal, it is free and accessible to everyone, anytime. “CanREA is proud to produce an annual consumer guide containing everything… Read More…

  • STANDATA Interpretation: 2024 Canadian Electrical Code, Part 1 Section 6 – Number of Supply Services Permitted

    STANDATA Interpretation: 2024 Canadian Electrical Code, Part 1 Section 6 – Number of Supply Services Permitted

    March 21, 2025 Purpose To clarify requirements for installations regarding the number of supply services permitted to be located on one unit of a building consisting of row housing for residential occupancies. Discussion There has been inconsistent application of the 2024 Canadian Electrical Code (CE Code) Part 1, Rule 6-102 regarding type and location where… Read More…

  • PEI Pauses Solar Electric Rebate Program

    PEI Pauses Solar Electric Rebate Program

    March 21, 2025 Rebate pre-approval letters for the Solar Energy Rebate program are currently on hold as the PEI government conducts a program review to ensure it continues to provide the best possible benefits to the most Islanders. We appreciate your patience. We do expect the program to be operational in the coming weeks. Check… Read More…


Changing Scene