Hubbell Announces Promotion of Frank Magisano to VP & GM of Hubbell Canada

April 7, 2025

Magisano

Hubbell has announced the promotion of Frank Magisano to the position of Vice President & General Manager of Hubbell Canada.

“I am truly honored and humbled to accept the role of Vice President and General Manager of Hubbell Canada.   With the greatest of respect and admiration, Kevin Mallory has left a legacy of solid leadership and commitment. A huge thank you to Kevin for all he’s done for Hubbell Canada and the Canadian electrical industry,” Magisano said via LinkedIn. “I’m looking forward to building on our successes and leading with passion. We’ll continue to keep progressing with innovation, teamwork and collaborative industry partnerships.”

“Frank joined the Hubbell team in 2001 and has since demonstrated exceptional leadership and expertise across various departments, including engineering, operations, and business development. His comprehensive understanding of the industry and dedication to excellence have significantly contributed to our success and make him the perfect fit for this new role,” the company commented.

Related Articles


Latest Articles

  • Open Letter: Specifying Electrical Conduit for Critical Facilities

    Open Letter: Specifying Electrical Conduit for Critical Facilities

    June 5, 2026 Dear Industry Professionals, When specifying electrical conduit for critical facilities, such as hospitals and data centers, the finish on your raceway system is just as crucial as its structural integrity. Many non-domestic steel products use electroplated zinc coatings that harbor a hidden, expensive liability: zinc whiskers. These microscopic, electrically conductive metallic filaments Read More…

  • Engagement Begins on Prompt-Payment Legislation in BC

    Engagement Begins on Prompt-Payment Legislation in BC

    June 1, 2026 Engagement is now open to support the implementation of the new Construction Prompt Payment Act, which is designed to ensure fair, on-time payment for contractors and subcontractors. Engagement is taking place through the B.C. Construction Prompt Payment Act discussion paper. This paper has been distributed to partners in the construction industry to collect Read More…

  • Why New Pool and Hot Tub Code Changes Matter More Than Ever

    Why New Pool and Hot Tub Code Changes Matter More Than Ever

    June 1, 2026 As an electrical contractor, pools and hot tubs aren’t just another install. They’re high-liability environments where small oversights can turn into serious safety issues. And those risks aren’t theoretical. “We are seeing reports of shocks at hot tubs,” says ESA Technical Advisor Trevor Tremblay. “We had one example of people just relaxing Read More…

  • How Do I Choose the Right Conductor Material for Cables and Wires?

    How Do I Choose the Right Conductor Material for Cables and Wires?

    May 29, 2026 By Christian Dettmer, Head of Technical Department – HELU The conductor material is the heart of a cable or wire. It forms the core and ensures efficient transmission of energy, signals, or data. Depending on the area of application, the right choice is crucial for the reliability, service life, and performance of Read More…


Changing Scene