Milwaukee PACKOUT™ Rack Kit

July 23, 2025

Milwaukee® PACKOUT™ Rack Kit is designed to eliminate common jobsite frustrations such as disorganization, wasted space, and tool movement during transit, this solution offers a smarter, more secure way to access and store tools and materials. For use in vans, CONEX boxes, enclosed trailers, and shop walls the PACKOUT™ Rack Kit allows professionals to take control of their storage, whether on the jobsite, in the shop, or in transit. 

“Through our research in the field, we identified the most common frustrations professionals face with storage, and set out to solve them,” Tanner Mascarenas, Milwaukee Product Manager. “The Packout Rack Kit boosts productivity by reducing the time spent locating, sorting, and organizing tools—resulting in faster restocks and van changeovers, ultimately saving users both time and money.”  

Reducing time spent shuffling through vans for materials and tools… The sliding drawers allow users to quickly retrieve tools and materials, decreasing time spent unstacking. With a fully customizable drawer layout, users can adjust the height of each drawer to connect any PACKOUT™ components directly onto the drawers. This level of flexibility makes it easy to build a storage solution that evolves with the job. 

Scalability is another key advantage of the PACKOUT™ Rack Kit. This solution can be stacked up to three racks high and expanded across the wall, making it easy to grow alongside evolving jobsite demands. To further enhance versatility, the rack features adjustable leg heights to fit above wheel wells and accommodate rolling tool boxes. For added convenience, two compact mounting plates can be fastened to the sides of the rack, offering additional storage for frequently used tools and accessories.  

Built to withstand the toughest conditions, the PACKOUT™ Rack Kit features a durable steel body and a 50lb drawer capacity in transit. By helping users maximize space, stay organized, and reduce downtime, the PACKOUT Rack Kit is more than just a storage upgrade, it’s a game-changing solution for professionals who demand efficiency and durability from their storage solutions. 

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • PataBid Raises $2 Million Pre-Seed Round to Modernize Construction Estimating with AI

    PataBid Raises $2 Million Pre-Seed Round to Modernize Construction Estimating with AI

    October 19, 2026 Calgary-based PataBid has raised $2 million in pre-seed funding to transform how contractors estimate complex subtrade construction projects. Led by Graphite Ventures, with participation from Sprout Fund, Bluesky Equities, Inverted Ventures and previous angel investors, the round will deepen PataBid’s AI product development capabilities, expand its supplier partnerships and distribution channels, and… Read More…

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…