Centro Emergency Lighting Smart Technology

January 26, 2026

Centro is an all-in-one solution that handles Normally ON, Normally OFF, and communication using a single pair of wires.

Connected via Ethernet, it can be controlled through web interface anywhere in the world. This allows you to manage up to 120 emergency units (signs/remotes) within a single building or oversee several buildings remotely from one central access point.

Reliability is the most important feature of any emergency power source. Without it, all other features and benefits are meaningless. The Centro system is an innovative and reliable solution that greatly simplifies the installation process and considerably reduces the cost of material, labour, monitoring and maintenance.

Normally on signs and normally off remotes must operate independently on the building’s power during a power failure. It thus requires two different cables to connect the emergency fixtures. A third wire is essential to allow communication between the units. It, therefore, generates important material and labour costs, especially for large/vast buildings where running thousands of feet of wires are needed.

The Centro system is the perfect solution to reduce those costs because it only involves a single cable instead of three. The Centro drivers within each unit will determine what is normally off or normally on in the circuit. It also permits communication between the units and the Centro Software.

CIRCUITRY
  • 120/277/347VAC input, field selectable
  • 24VDC output
  • 144W maximum evenly split across 6 inputs (channels) not exceeding 54W per input (channel) and 120 devices
  • 2 DC terminal blocks per input (channel)
  • Wattage capacity of 144W maximum for 30 and 60 min emergency power duration standard
  • Extra battery pack can be added for more duration
  • Fully automatic, current limited charger
  • High performance battery
  • Programmable auto-test
  • Ethernet port
  • TFT display
  • 4 operations buttons
  • CSA C22.2 #141-15 certified by Intertek (ETL)
COMPATIBLE DEVICE
  • Signs: Stella RM, Quadra RM, Forma RM, Forte RM, Aqua RM, Soldato RM
  • Remote: SR, Soldato Remote, BTMR, RMR, RMR-REM

More Information

Related Articles


Latest Articles


Changing Scene

  • EB Horsman & Son Expansion in Alberta: New Grande Prairie Branch Opening 2026

    EB Horsman & Son Expansion in Alberta: New Grande Prairie Branch Opening 2026

    May 25, 2026 EB Horsman & Son have announced they are expanding in Northern Alberta with a new branch coming to Grande Prairie. As one of the fastest‑growing cities in the province and a major hub for the oil and gas, forestry, and agriculture sectors, Grande Prairie is a natural fit for their continued growth Read More…

  • Milwaukee Tool Officially Opens Service Hub in Georgina, Ontario

    Milwaukee Tool Officially Opens Service Hub in Georgina, Ontario

    May 21, 2026 Milwaukee Tool today celebrated the official ribbon-cutting ceremony of its first-ever Service Hub in Canada, located at 1 Logistics Ct. in Georgina’s Keswick Business Park. The milestone event was attended by Milwaukee Tool leadership, Town of Georgina officials and local community stakeholders, marking a significant step in Milwaukee Tool’s continued investment in Read More…

  • Cascadia Sales Representing Eaton in BC

    Cascadia Sales Representing Eaton in BC

    May 21, 2026 Cascadia Sales are thrilled to announce that effective May 11, 2026, they will officially be representing an expanded portfolio of Eaton brands across British Columbia. “Adding Crouse-Hinds, B-Line, Bussmann, and Cooper Power series to our lineup allows us to provide even more comprehensive electrical solutions to our BC partners,” the company said Read More…

  • Nedco Opens New Kelowna Branch

    Nedco Opens New Kelowna Branch

    May 21, 2026 In a recent announcement from Nedco, the company celebrated the Grand Opening of the new Kelowna branch on Friday, May 8, 2026. Nedco invited attendees to explore the new 11,000 sq. ft. facility designed to conveniently serve Okanagan customers. The tour of the new facility took place from 11:00 AM to 2:00 Read More…