Metalux CGTS Selectable Panel

February 12, 2026

The CGTS Selectable Panel LED series is the contractor go-to selectable back-lit panel providing customers an affordable, low glare panel that fits in shallow plenums with room to spare. Offering both selectable lumens and selectable color the CGTS is flexible for any commercial space. Acrylic micro optics provide uniform illumination from corner to corner.

It’s back-lit, durable design provides immediate opportunities to replace fluorescent fixtures with a LED solution and reduce inventory on shelf with (9) skus in (1). The CGTS Flat Panel LED is an excellent lighting solution for commercial office spaces, schools, healthcare and retail merchandising areas.

Features

  • Selectable lumens with low, medium and high settings from 2500-6800 lumens
  • Selectable CCT offered in 3500K, 4000K, and 5000K settings
  • Shallow less than 2″ fixture height, ideal for shallow plenums
  • Selectable switches on junction box top, for easy access before and after installation
  • Frosted smooth lens with over-optic LEDs for uniform, pleasing distribution from corner to corner
  • DLC listed for energy savings and rebate opportunities
  • Post painted components, light-weight design, and oversized junction box for quick and easy install
  • Minimalist design for visual comforting aesthetics

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…