CONVECTAIR Fresco Commercial Fan-forced Heater

February 26, 2026

A commercial fan-forced heater designed to warm vestibules, stairwells, and other draft-prone spaces with fast, reliable comfort. Ideal for commercial and utility areas, it offers dual-rated heating from 1500 W to 4000 W to adapt to different applications and installation needs.

Fresco

Ideal for maintaining comfort in areas exposed to cold drafts, such as vestibules and stairwells, with easy mounting holes for quick installation and built-in thermal overheat protection for safety.

  • Provides adaptable heating performance with selectable high or low output operation.
  • Comfort Start Technology prevents cold-air blasts by warming the element before fan activation.
  • Includes three interchangeable grill and knob color options to match different interiors.
  • Built-in thermal overheat protection supports safe, dependable long-term use.

Key Technical Specifications

  • Wattage 4000/3000 | 2000/1500
  • Voltage 240/208
  • Electric Connection Hard-Wired
  • Cut Out Wall Dimensions – Height (in) 18.5
  • Cut Out Wall Dimensions – Depth/Length (in) 4

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…