Fluke 1587 FC Insulation Multimeter

March 2, 2026

Fluke Connect + Fluke’s 1587 FC Insulation Multimeter helps you identify tough problems, fix, and wirelessly communicate your work quickly and easily – all at a safe distance.

Key features

  • Safety first. Connect the insulation tester then keep yourself out of harm’s way by monitoring your test measurements remotely.
  • Prove your job is done right by quickly seeing and sharing insulation resistance test results wirelessly with your smartphone.
  • Quickly find problems by saving and comparing measurements over time on a wireless device.
1587

Add diagnostics with Fluke Connect

The Fluke 1587 FC is Fluke Connect-enabled so you can download the free Fluke Connect® Measurements app to your smartphone and gain additional functions, including:

  • Safety first. Keep yourself out of harm’s way by monitoring your test measurements remotely.
  • Prove your job is done right by quickly seeing and sharing measurement results wirelessly with your smartphone.
  • Quickly find problems by saving and comparing measurements over time on a wireless device.
  • PI/DAR timed ratio tests with TrendIt™ graphs to identify moisture and contaminated insulation problems faster
  • Memory storage through Fluke Connect that saves measurements to your phone or the cloud and eliminates the need to write down results. Reduces errors and saves data for historical tracking over time
  • Temperature compensation to establish accurate baselines and relevant historical comparisons
  • Historical tracking and trending of assets to identify insulation degradation over time and allow real-time decisions to be made in the field with Fluke Connect® Assets (sold separately)
  • Provides memory storage through Fluke Connect Measurements to eliminate the need to write down results
  • Includes live circuit detection to prevent insulation test if voltage >30 V is detected
  • Supports historical tracking and asset trending of assets to identify degradation over time with Fluke Connect® Assets (sold separately)
  • Incorporates VFD low-pass filter for accurate variable frequency motor drive measurements
  • Includes auto-discharge of capacitive voltage for added user protection
  • Measures ac/dc voltage, dc millivolts, ac/dc milliamps, resistance, and continuity
  • Includes capacitance, diode test, temperature, min/max, frequency measurements and insulation test smoothing reading
  • Automatically powers off to save battery power
  • Comes with remote probe, test leads, alligator clips, K-type thermocouple, hard case, and three-year warranty.

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…