HALO ML Flex Canless LED Downlights

March 5, 2026

Elevate spaces with the sleek and modern designs of this high-end fixture series. Striking, small-aperture luminaires with precision-engineered trims create inviting, low-glare environments. With ML Flex, you can downlight, adjust, and wall wash with fixtures that boast advanced color and lumen seleCCTable™ technology along with flicker-free dimming below 5%. The Flex Series delivers ideal lighting in any application — residential or commercial. Experience the ultimate in style, functionality, and affordability with HALO.

These downlights are engineered to blend seamlessly into any space, allowing you to see the beauty of your surroundings without being distracted by the light source itself. With their sleek design and advanced LED technology, they provide both aesthetic appeal and efficient illumination.

During installation, select the optimal brightness for your ceiling height. Set the perfect ambiance with versatile color temperature options. The Dim-to-Warm setting lets you transition from bright white (3000K) to candlelight (1800K). Choose from five color temperatures, ranging from warm white (2700K) to daylight (5000K), to find the right match for your needs.

Flex

Features

  • 1”, 2”, 3” & 4” Downlights and 3” & 4” Wall Washers
  • Canless installation means fixtures mount directly to the ceiling (no housing required); Use with canless mounting frames for new construction installations
  • Interchangeable round or square trims in either smooth or baffle with optional mud-in frames
  • Field-interchangeable TIR optics 25°, 40°, 55°, and 25° asymmetric for wall wash
  • 5-color Field-SeleCCTable™ (27/30/35/40/5000K) or Field-SeleCCTable™ Dim-to-Warm: 3000K/2700K-to-1800K; 90+ CRI
  • Lumen Select (nominal): Low/Medium/High options from 100 to 1,200 lm
  • Dimming Versions: ≤5% in either phase cut LE/TE (120V) with compatible dimmers OR 0-10V (UNV 120–277V)
  • AIR-TITE, Wet location-listed, IC-rated
  • 50,000 hrs of maintenance-free operation
  • 5-year warranty

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…