In-Ground Well Light from Magic Lite

May 4, 2026

Illuminate columns, fences, and trees discreetly with this well light. Designed for flush installation, it features a robust die-cast aluminum housing and a powerful integrated 6-watt LED. Waterproof and backed by a 15-year warranty.

In-Ground Well Light from Magic Light

Features:

  • Die-cast aluminum housing
  • Sleeve included
  • 12-24V
  • Black finish
  • 580-lumen output
  • 3000K
  • 18/2 wire pigtail

Specifications

Product CodeIG-01-12V-36D-BLKIG-01-12V-60D-BLK
ElectricalInput Voltage12/24V AC/DC
Power Consumption6W
SpecsColour Temperature3000K
CRI90+
Lumen Output580LM
Efficacy (LM/W)97
DimmableN/A
Beam Angle36°60°
LEDTypeSMD2835
Life Span50,000 Hours
DesignDimensions (Inches)3.03 x 4.02″
Dimensions (Millimeters)76.9 x 102 mm
FinishBlack
MaterialDie-cast Aluminium
CableCopper
Operating Temperature-20 to 40°C
Approved LocationOutdoor
Mountingin ground
Warranty15 years
ApprovalscETLus

Related Articles


Latest Articles

  • Common Lighting Pitfalls and How to Avoid Them

    Common Lighting Pitfalls and How to Avoid Them

    May 4, 2026 By CSC LED Fast-paced projects leave little room for error. Even experienced teams can encounter common lighting pitfalls that slow down installs, create uneven results, or add unnecessary costs. Understanding what to look out for—and planning ahead—can save time, reduce rework, and improve the final outcome. Here are five areas where projects Read More…

  • HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    May 1, 2026 In multifamily buildings, the electricity meters are supplied by transformers or by the main electrical service panel, whose capacity has not initially been planned to supply an electric vehicle charging infrastructure for 100% of the units simultaneously. RVE’s HUB is an energy management system (EVEMS) that eliminates the need to upgrade electrical infrastructure; Read More…

  • ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    May 1, 2026 This proposed change intends to reflect the current industry trend towards increasing standard equipment sizes of inverters, commonly reaching values greater than 10kW, and supports harmonization within the industry. The OEB (Ontario Energy Board) issued proposed amendments in October 2025 which included increasing the maximum threshold capacity for a micro-embedded generation facility Read More…

  • Canada’s Construction Industry Navigates Uncertain Economic Landscape with Higher Costs and Geopolitical Volatility

    Canada’s Construction Industry Navigates Uncertain Economic Landscape with Higher Costs and Geopolitical Volatility

    April 30, 2026 The Canadian Construction Association (CCA) released the spring edition of its Construction Quarterly Economic Insights report, highlighting a mixed but resilient outlook for Canada’s construction sector. Construction GDP eased by 0.6 per cent in Q4 2025, signifying the first pullback after six consecutive quarterly gains. Rebounding building permits and steady domestic demand are setting Read More…


Changing Scene