|

Canada and New Brunswick Invest in a New Wastewater Treatment Facility in Rothesay

October 30, 2026

The Government of Canada is using every tool at its disposal, leveraging technology, innovation and partnerships, to build homes at scale.

To that end, the Governments of Canada and New Brunswick, in partnership with the Town of Rothesay, have announced a joint investment of more than $28 million in two projects to build a new wastewater treatment facility in Rothesay and expand municipal water, wastewater, and stormwater service to allow for new housing development.  

This was announced by Secretary of State Wayne Long, Minister Alyson Townsend and Mayor Matt Alexander.

The first investment supports the second phase of construction (phase 2B) for the new wastewater treatment facility on Maliseet Drive. The new facility will use ultraviolet disinfection which will increase the municipality’s capacity to treat and manage its wastewater. An earlier phase of this project (phase 2A) was announced in 2021.

In addition, the second project involves the installation of 1 kilometre each of water, wastewater, and stormwater pipes in order to facilitate the construction of the Legacy Village seniors’ housing development on Villa Madonna Road. This new infrastructure will enable the construction of up to 89 housing units. This project is part of the Governments of Canada and New Brunswick’s funding agreement that is paving the way for the construction of more homes to support a growing population.

These important infrastructure projects support the Government of Canada’s goal to address the housing crisis, and complement the work of Build Canada Homes, a new federal agency that will build affordable homes, support builders with financing, and encourage better building methods.

Together, we will make housing more affordable by unleashing the power of public-private cooperation, catalysing a modern housing industry, and creating new careers in the skilled trades.

Quick Facts

Rothesay – Wastewater Treatment Facility Upgrade – Phase 2B

  • For phase 2B of the wastewater treatment facility, the federal government is investing $10,200,000 through the Green Infrastructure Stream (GIS) of the Investing in Canada Infrastructure Program. The Government of New Brunswick is investing $8,499,150 and the Town of Rothesay is contributing $6,800,850.

Legacy Village Development in Rothesay, NB

  • For the water, wastewater, and stormwater infrastructure at Legacy Village, the federal government is investing $1,401,775 through the Provincial and Territorial Agreement stream of the Canada Housing Infrastructure Fund (CHIF), while the Government of New Brunswick is investing $934,423 and the Town of Rothesay is contributing $467,352.
  • CHIF is designed to help communities build the infrastructure necessary to support more homes and increase housing density. The funding can be used for projects that improve drinking water, wastewater, and stormwater systems, as well as initiatives that preserve existing capacity, enhance system reliability, or implement waste diversion measures to reduce landfill use.
  • The federal government is investing $3.65 billion in local infrastructure across Canada through CHIF.
  • A share of CHIF is allocated to support long-term provincial and territorial priorities. Provinces and territories must finalize an agreement with the Government of Canada and commit to key housing-enabling conditions to receive funding.
  • Launched on September 14, 2025, Build Canada Homes is Canada’s new federal agency, with the mandate to scale up the supply of affordable housing. By leveraging public land, flexible financial tools, and modern methods of construction, the agency is catalysing a more productive and innovative homebuilding industry.

Source

Related Articles


Latest Articles

  • Choosing the Right Electrode Boiler Configuration

    Choosing the Right Electrode Boiler Configuration

    October 30, 2026 Horizontal and vertical immersed-electrode designs, along with vertical jet-type boilers, provide different advantages depending on whether the application requires steam or hot water, the necessary output, and the physical limitations of the installation High-voltage electrode boilers are now available at outputs extending well into the tens of megawatts, placing them in major… Read More…

  • What Can be Done to Combat Copper Theft?

    What Can be Done to Combat Copper Theft?

    October 30, 2026 Patience Cathcart, Public Safety Officer, Electrical Safety Authority talks about the issues facing communities like Windsor-Essex and what residents and businesses can do to protect themselves Source Read More…

  • From Blueprint to Smart Home: Getting Integration Right

    From Blueprint to Smart Home: Getting Integration Right

    October 30, 2026 Smart home technology is becoming an increasingly important part of modern construction, but too often, automation is considered only after a project is already underway. What happens when smart technology is brought into the conversation too late, and how can builders, architects, and integrators work together to deliver better results? In this… Read More…

  • Webinar Roundtable: Supply Chain Resilience and Circularity

    Webinar Roundtable: Supply Chain Resilience and Circularity

    October 30, 2026 Copper, aluminum and polymer markets are under mounting geopolitical pressure. Join Nexans, Suez, Equans and SE Advisory Services for a live conversation on how circularity turns resource scarcity into a source of resilience. “Building resilient supply chains through circularity and innovation” A cable is a bundle of strategic commodities, and every one… Read More…


Changing Scene