IESO Awards 16 Contracts for Large Renewable Energy Projects in Ontario

March 12 2026 

The Independent Electricity System Operator (IESO) has awarded 16 contracts under a competitive process for procuring large renewable energy projects greater than 500 kilowatts. The 16 contracts offered represent 454.885 megawatts (MW) of clean renewable energy capacity.

The results include:

  • -5 wind contracts totalling 299.5 MW, with a weighted average price of 8.59 cents/kWh
  • -7 solar contracts totalling 139.885 MW, with a weighted average price of 15.67 cents/kWh
  • -4 hydroelectric contracts totalling 15.5 MW, with a weighted average price of 17.59 cents/kWh

Of these, more than 80% or 13 projects (336.8 MW) include participation from one or more Aboriginal communities, including 5 with more than 50% Aboriginal participation.

Additionally, more than 75% of the successful proposals had received support from local municipalities, and more than 60% had support from abutting landowners.

The projects are located here:

  • Alfred and Plantagenet Township
  • Chatham Kent & Town of Lakeshore
  • Dutton Dunwich
  • Haldimand County
  • Municipality of The Nation and Township of Champlain
  • Oro-Medonte Township
  • North Stormont
  • Prince Edward County
  • Quinte West
  • Ryerson Township
  • Selwyn Township (in partnership with Trent Lakes)
  • Stone Mills Township
  • South Stormont Township (in partnership with Cornwall)

The competitive process introduced “strong competition among developers of large renewable projects, helping to drive down price and secure clean, reliable generation for the province,” says Bruce Campbell, President and CEO, IESO.

Find out more: www.ieso.ca/Pages/Media/Release.aspx?releaseID=7322.

 

Related Articles


Latest Articles

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…

  • Tom Penton & Magic Lite: Forty Years of Leadership in Canadian Lighting

    Tom Penton & Magic Lite: Forty Years of Leadership in Canadian Lighting

    January 12, 2026 By John Kerr Sales has always been at the core of Magic Lite’s story, because it was at the core of who its founder Tom Penton was. He genuinely loved sales, loved being independent, and consistently gravitated to roles where he could take personal responsibility for results and build his own customer Read More…


Changing Scene

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…

  • Federal Government Invests in Four Ontario Steel Companies

    Federal Government Invests in Four Ontario Steel Companies

    January 12, 2026 Through targeted investments, the Government of Canada is committed to providing support to help businesses in all sectors, including steel and automotive, to respond, adapt and compete amid shifting market conditions. Evan Solomon, Minister of Artificial Intelligence and Digital Innovation and Minister responsible for the Federal Economic Development Agency for Southern Ontario Read More…

  • Craftsman V20 150W Power Inverter Recalled Due to Fire Hazard

    Craftsman V20 150W Power Inverter Recalled Due to Fire Hazard

    January 12, 2026 This recall involves the Craftsman V20 150W Power Inverter (Model number: CMCB1150B). The product has a rectangular prism shape with dimensions of 8.13 x 7.62 x 11.68 cm. It is red and black and weighs 320 grams. It has three charging ports for Type-C, Type-A, and AC connections. It contains an LED Read More…