FortWhyte Alive Launches Largest Solar Installation in Winnipeg

FortWhyte Alive

Ocotber 12, 2017

FortWhyte Alive is unveiling the largest solar installation in the City of Winnipeg. The 60 kilowatt (kW) installation is made possible thanks to support from Bullfrog Power, Investors Group and Manitoba Hydro’s Solar Energy Program. 

“As community leaders in sustainability, we believe that harnessing solar power at FortWhyte makes perfect sense for us from both an environmental and economic perspective,” says FortWhyte Alive President and CEO, Bill Elliott. “As we face the growing challenges of climate change, we look forward to using this solar farm as a tool to educate the public on the importance of transitioning to clean, renewable energy across the globe.”

The FortWhyte Alive solar installation will generate enough carbon-free solar power to make up 50 per cent of the electricity consumed at FortWhyte Farms. In addition to the environmental benefits of the project, the solar power generated is expected to save FortWhyte Alive approximately $350,000 in energy costs during the 30-year lifespan of the panels.

“Bullfrog Power’s community renewable projects program is all about supporting clean power projects that educate people about the impacts of how we power our lives and the actions we can take on climate change,” says Ron Seftel, CEO of Bullfrog Power. “We hope the FortWhyte Alive solar project will have a meaningful impact in terms of generating both green electricity and awareness on climate change for decades to come.”

As part of its work as a social enterprise, Bullfrog Power has supported more than 130 green energy projects nationwide through its community renewable projects program. Investors Group, a bullfrogpowered organization since 2015, has a long history of community involvement, corporate funding and project initiation and is helping to support the FortWhyte Alive solar project alongside Bullfrog Power as part of its commitment to renewable energy.

“Investors Group believes in giving back to the communities where our people live and work,” says Andrea Carlson, VP Finance and Corporate Responsibility, Investors Group. “FortWhyte Alive has always focussed on helping us learn about the natural world; this solar project will showcase the clean technology we need to preserve the natural world for future generations.”

Related Articles


Latest Articles

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…

  • BCCA Official Statement on Construction Projects Procurement Act

    BCCA Official Statement on Construction Projects Procurement Act

    March 13, 2026 On March 5, 2026, Kiel Giddens, MLA for Prince George – Mackenzie and Critic for Labour, introduced the Construction Projects Procurement Act, a Private Member’s Bill aimed at restoring fair and open procurement on public construction projects in British Columbia. BCCA has a long history of advocating for fair and open public procurement. Read More…


Changing Scene

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • Sonepar Company Opens a New Automated Distribution Center in Las Vegas

    Sonepar Company Opens a New Automated Distribution Center in Las Vegas

    March 13, 2026 Codale Electric Supply, a Sonepar company, is transforming electrical distribution with the launch of its central distribution center located just off the Las Vegas Strip, in October 2025. The site features a highly automated setup designed to improve speed, accuracy, and customer convenience. At the heart of the facility is an advanced Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…

  • KPMG Establishes Major Products Delivery Office

    KPMG Establishes Major Products Delivery Office

    March 13, 2026 KMPG: Complex projects require well-structured teams, appropriate delivery models tailored to the project’s needs, robust governance frameworks, and stable execution environments: KPMG Canada Canada is entering a defining era of major project development that has significant implications for the nation’s economic future, as the country works to establish new trade partnerships, develop its resources, reinforce Read More…