The Electric Circuit and Groupe Crevier Open Québec’s First Universal Superstation

Electric Circuit

 

December 19, 2017

The Minister of Energy and Natural Resources, Pierre Moreau, accompanied by representatives of the Electric Circuit and Groupe Crevier, has unveiled a new public universal fast-charge superstation concept for electric vehicles in an environment that brings users a full range of services. The two partners also announced their intention to install fast-charge stations at about ten service stations over the next two years.

 

Located off exit 112 on Highway 20, the busiest in Québec, the state-of-the-art superstation offers four 50-kilowatt fast-charge stations that can simultaneously charge one vehicle each. Designed by the Québec firm Morelli Designers, the superstation has an adaptable configuration that renders its installation optimizable, making possible both the addition of charging stations and the integration of new, more powerful technologies. The concept also offers an attractive, easily recognizable visual signature with a lit-up background.

 

This new superstation is a real living laboratory: it will be used to test new charging technologies as soon as they come out (e.g., 100-kilowatt charging stations and more), as well as various additional services, such as dynamic pricing. It will also collect user feedback to improve future superstations as needed.

Several Québec companies collaborated on producing this first superstation prototype, led by the Electric Circuit. The centralized 200-kilowatt electric module was designed and manufactured by Automation R.L. from Varennes; the architectural structure was built by ScèneÉthique, also from Varennes; and the lighting bears the signature of Luxaz from Brossard.

“I am delighted by the inauguration of this quick-charge superstation, which is the result of the vision of the Government of Québec and the leadership of Hydro-Québec and Groupe Crevier. The deployment of this type of infrastructure is the determining factor in the adoption of electric vehicles, a crucial element if we are to reach our greenhouse gas reduction targets and build a new Québec with a low carbon footprint,” said Pierre Moreau, Minister of Energy and Natural Resources, Minister responsible for the Plan Nord and Minister responsible for the Gaspésie—Îles-de-la-Madeleine region.

“Drivers’ needs are in constant evolution, and service station networks will have to adapt and adopt new energies in order to develop an attractive multifuel offer for customers,” said Jean-François Crevier, President of Groupe Crevier. “Our partnership with the Electric Circuit to offer increasingly innovative products, such as the first universal fast-charge superstation, makes it clear that we want to position ourselves in this time of transition and send the message that we will consider any new opportunity that will help us meet our customers’ ever-evolving needs!”

“Since the launch of the Electric Circuit in 2012, we have constantly introduced new services, always prioritizing a high-quality, simple user experience for our members,” said Steve Demers, Hydro-Québec’s Vice President – Business Development. “With this superstation, we want to better meet the needs of electric vehicle users, who have asked us for more charging stations per site, and reassure future buyers of the availability of our network.”

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…