Alberta Offers New Industrial Energy Efficiency Rebates

Alberta

 

Mar 13, 2018

Industrial businesses in Alberta, including small-to-medium sized oil and gas industries, are now eligible to receive rebates for switching to energy-efficient products Energy Efficiency Alberta’s Business Non-Profit and Institutional (BNI) Energy Savings Program.

“Alberta’s industrial operators create jobs and drive our economy,” says Shannon Phillips, Minister of Environment and Parks and Minister responsible for the Climate Change Office. “By encouraging operators to replace old equipment with new energy-efficient products, we are helping Alberta businesses lower their energy bills, reduce their emissions and reinvest in their business. (Shown in photo: Minister Shannon Phillips and Energy Efficiency Alberta CEO Monica Curtis listening to ideas from business leaders on energy efficiency at the Calgary Chamber of Commerce.)

The program helps organizations reduce their energy use and greenhouse gas emissions by replacing outdated and inefficient equipment with new energy-efficient technologies. Most industrial facilities that are not large final emitters qualify for the program.

New energy-efficiency products for small to medium industrial facilities include:

• pump-off controllers for pump jacks
• variable frequency drives for combustion air fans
• steam trap survey and retrofit
• retro-commissioning for economizers and fresh air dampers
• pneumatic to electric instrument conversion
• compressed air leak detection and repair
• no-loss drains (compressed air)
• chiller tune-up
• loading dock door and pit seals
• valve repair —chilled water / hot water
• process exhaust filtration

Organizations purchase products and once installed submit product information and proof of purchase online to receive the rebate. Many contractors do this on behalf of their customers when they complete the installation.

As of December 2017, more than 1,200 organizations have participated in the BNI program, receiving a total of $3.5 million in rebates or an average of $2,600 per project.
For a list of eligible products and qualifying industrial sectors, and to learn about other opportunities to save energy, visit www.efficiencyalberta.ca.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…