Schneider Electric’s EcoStruxure Power Architecture Offers Canadian Energy Professionals Improved Energy Efficiency, Reliability and Operational Insight

Schneider Electric

Schneider Electric, the leader in the digital transformation of energy management and automation, launched its EcoStruxure Power energy management architecture in Canada at the company’s Innovation Day in Toronto. EcoStruxure Power will give Canadian energy professionals access to more reliable, efficient power, while delivering new insights about energy usage.

“Canadian business leaders and energy managers are looking for better solutions to reduce energy consumption and increase power availability,” said Adrian Thomas, Vice President of Building Business, Schneider Electric Canada. “EcoStruxure Power is our flexible IoT platform that integrates multiple data sources to measure, control and reduce energy usage, boost equipment performance and optimize asset usage.  It is already in use in Canada and we are seeing rapid adoption because it is easily scaled to any size enterprise.”

EcoStruxure Power is part of Schneider Electric’s EcoStruxure, an open and interoperable system architecture for buildings, grid, industry, and data centre customers. EcoStruxure brings together the company’s industry-leading connected products, edge control, applications, analytics and services into one connected and integrated framework for all areas of the power distribution and management chains. It enables organizations to discover new efficiencies in their operations.

EcoStruxure Power is organized around three core layers of technology innovation:

  • Connected Products – an extensive range of connected products which collect and manage data for 24/7 connectivity, bringing enhanced intelligence and efficiency to operations. This includes MasterPact™ MTZ next-generation low-voltage breakers with embedded Class 1 metering for seamless smart panel integration, also announced at Schneider Electric’s Innovation Day in Toronto.
  • Edge Control – enables superior real-time control of operations, either on-site or through the cloud.
  • Apps, Analytics and Services –allows customers to make informed and timely decisions to ensure reliability, reduce costs and boost efficiency.

EcoStruxure™ has been deployed in more than 480,000 installations globally, with the support of more than 20,000 system integrators, connecting over 1.5 million assets.

About Schneider Electric
Schneider Electric is leading the Digital Transformation of Energy Management and Automation in Homes, Buildings, Data Centres, Infrastructure and Industries.

With global presence in over 100 countries, Schneider is the undisputable leader in Power Management – Medium Voltage, Low Voltage and Secure Power, and in Automation Systems. We provide integrated efficiency solutions, combining energy, automation and software.

In our global Ecosystem, we collaborate with the largest Partner, Integrator and Developer Community on our Open Platform to deliver real-time control and operational efficiency.

We believe that great people and partners make Schneider a great company and that our commitment to Innovation, Diversity and Sustainability ensures that Life Is On everywhere, for everyone and at every moment. 

www.schneider-electric.ca

 

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…