Siemens Canada, NB Power and Nova Scotia Power Receive $36M for Smart Grid Atlantic Project

Siemens

Jan 29, 2019

The $35.66 million in federal funding is for a joint pilot project that will research and test in real time how the grid of the future can optimize integration of renewables, ensure grid stability, and manage decentralized distribution in order to better manage the provinces’ electricity, potentially reduce future electricity costs for consumers, and reduce greenhouse gas emissions.

“This partnership will be truly ground-breaking,” says Faisal Kazi, President and CEO of Siemens Canada. “Together with NB Power and Nova Scotia Power, we will develop and implement a powerful cloud-based energy system platform (ESP), allowing everyone to participate in the energy market. The ESP will enable data analytics, ensure connectivity, and provide tools for developers to create customer-focused applications and services. The platform will also optimize the overall electrical grid accelerate transitioning into a greener future not only in Canada but throughout the globe.”

Siemens will research and develop the made-in-Canada ESP software and NB Power and Nova Scotia Power will provide the needed assets and customer engagement to demonstrate and test these platforms in real scenarios and real time. Siemens and its partners have also committed to imore collaboration with post-secondary institutions, driving greater gender diversity in the workforce, developing intellectual property (IP) produced in Canada, and driving more engagement with local indigenous communities in the clean energy sector.

“Our goal is to gradually eliminate the remaining 20 to 25% of our generation that is carbon producing while ensuring we protect our customers from the significant rate increases that have resulted from this transition elsewhere,” says Gaëtan Thomas, President and CEO, NB Power. “The only way to have a fully renewable future is with smart grid technologies that ease the acceptance of small-scale renewables onto the grid. With these new federal investments, we’ll be able to accelerate our pilot projects and testing to ensure that customers get a greener New Brunswickgrid without the disruptions we’re seeing in other parts of the world.”

Photo source: Siemens

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…

  • EB Horsman Unveils New Mural at Campbell River Branch

    EB Horsman Unveils New Mural at Campbell River Branch

    July 14, 2025 EB Horsman & Son are thrilled to unveil a new mural at their Campbell River branch, painted by the talented Kwakwaka’wakw artist, Adam Lewis. “This stunning piece celebrates Indigenous heritage and our community spirit,” said EB Horsman on LinkedIn. “As we mark 125 years of serving Western Canada and 55 years in… Read More…

  • Glenco Electric Celebrate New Red Seal Team Members

    Glenco Electric Celebrate New Red Seal Team Members

    July 14, 2025 “The Red Seal Journeyman designation is the highest recognition in the trades, and we’re proud to have seen so many of our team members earn it under our watch,” said Glenco Electric on LinkedIn. “At Glenco, we’re big on mentorship and promoting from within. When you combine that with driven, hard-working professionals,… Read More…

  • Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    July 14, 2025 The governments of Canada and Ontario are investing up to $3 million and launching the third intake of the Agricultural Stewardship Initiative (ASI) to help farmers implement projects to improve the energy efficiency of their farming operations. To support the province’s plan to protect Ontario, this funding will help local agriculture, agri-food… Read More…