New Alberta Energy Efficiency Code

Alberta Energy Efficiency Code

Feb 24, 2019

The 2017 edition of the National Energy Code for Buildings (NECB) was adopted this month by provincial regulation. Also adopted this month: the 2019 editions of the Alberta Building Code and Alberta Fire Code, based on the 2015 editions of the National Building Code and National Fire Code.

The Energy Code deals with the following building components:

1. Building envelope — the separation between the interior and the exterior environments of a building, comprising of its exterior walls, roof, foundation and slab-on-ground

2. Lighting — interior and exterior lighting components and systems connected to the buildings electrical service

3. HVAC — heating, ventilating and air-conditioning, including such items as ducting and piping, controls, ventilation and related equipment

4. Service water heating — systems used for the supply of water for purposes other than space heating

Examples of increased energy efficiency requirements in Alberta’s safety codes

    • Energy-efficiency requirements for lighting, building envelope, insulation, windows, heating, ventilation and air-conditioning and service water heating in buildings and housing. (National energy code for buildings and Alberta building code for houses and small buildings)

    • Improved energy efficiency of elevating systems that puts previously unused power back into the system for other functions that results in 70% or greater energy efficiency savings (Elevating devices code)

    • Updated electrical codes for renewable energy systems, including:

o Fuel cell systems — fuel cells create electrical electricity from a chemical reaction

o Wind systems — energy harvested by wind turbines and converted to electrical energy

o Hydrokinetic systems — energy gathered from the flow of water (hydro dams, tidal)

    • Boilers and pressure vessels codes, used for containers designed to hold gases or liquids at a pressure substantially different from the outside temperature, are undergoing innovative changes in design for energy efficiency. Oil refineries, mining operations, petrochemical plants, refrigeration units, power generation, storage of liquefied gases and many other applications are using clean-burning fuel, extraction processes, waste heat recovery or recycling. Alberta is one of the world’s largest manufacturers of pressure vessels for use in Alberta and world export.  (Pressure vessels code)

Alberta’s Electrical Code Regulation now adopts the following two codes:

    • CSA- C22.1-18 — Canadian Electrical Code, Part I (twenty-fourth edition)

    • Alberta Electrical Utility Code — 5th Edition, 2016

The Code for Electrical Installations at Oil and Gas Facilities is no longer adopted in Alberta as the Canadian Electrical Code, Part I (24th edition) now regulates this work.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…