Canada and U.K. Announce Finalists for the Power Forward Challenge

EIN CS 28 PowerForward 400

July 3, 2019

Under the challenge, seven teams from Canada and the U.K. will receive up to $3 million to start building a smart energy systems solution. In March 2021, a $1-million grand prize will be awarded to the team with the highest-performing solution.

Launched in October 2018, Power Forward challenged Canadian and U.K. innovators to join forces and accelerate breakthrough innovations that harness different energy resources for modernized power grids. The seven finalist teams were selected from a group of 44 project proposals received in a highly competitive process. They all pitched their solutions to a panel of expert judges representing grid operators, corporates, investors and governments at two pitch events held in Glasgow in May 2019 and in Ottawa in early June 2019.

With increasing demands and new energy sources powering our electricity systems, Canada needs to transform how we make and use energy. This includes modernizing  traditional power grids to be more digitally networked, flexible and resilient. 

The finalist teams developing projects in Canada are

  • London Hydro with Electron, ENMAX, the University of Western Ontario, Navigant and Gowling WLG
  • Lakeland Holding Inc. with Opus One Solutions, Kiwi Power, ATCO, Ryerson University, Georgian College and CHEC Group
  • Equilibrium Engineering with StorTera, Dalhousie University and Berwick Municipal Electric Commission

The finalist teams developing projects in the U.K. are

  • Scottish and Southern Electricity Networks with Opus One Solutions, Hydro Ottawa, Open Grid Systems, the University of Cambridge and Energy Policy Research Group
  • UNIT9 Ltd. with Simptek Canada Inc., Electronic Products and Technology, Avison Young, UCL Energy Institute, Carbon Smart and the University of Sheffield
  • Qbots Energy with ICONICS, Lanner Electronics, Energy Systems
    Catapult, Bruntwood Ltd., Manchester Metropolitan University, Hildebrand and Penso Power
  • Scene Connect Ltd. with Enbala, Locogen Limited and Mentone Energy Consulting Limited

Find out more about the Canadian finalists: https://impact.canada.ca/en/challenges/power-forward/finalists

Source

Related Articles


Latest Articles

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…


Changing Scene

  • Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    January 19, 2026 Leviton Canada is proud to announce its partnership with The Titan Group, who will now represent Leviton’s Residential and Commercial & Industrial product lines across the Midwest provinces, effective January 1, 2026. “We’re excited to begin our partnership with Titan,” said Bill Tischner, Western Sales Director. “Their industry expertise, commitment to service, Read More…

  • Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    January 19, 2026 Hammond Power Solutions is pleased to announce the appointment of Xavier Biot as Vice President, Strategic Accounts. In this role, he will lead HPS’s strategic account teams. He will partner with customers to align transformer and power quality solutions with evolving electrification, sustainability, and operational needs. His focus will be on helping Read More…

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…