NB Power Seeing Progress on Small Modular Reactor Work

EIN 33 CS NB Power 400

Aug 8, 2019

NB Power President and CEO Gaëtan Thomas says he is pleased with the progress made to date by Advanced Reactor Concepts (ARC) Nuclear and Moltex Energy, the two companies carrying out research and development of small modular reactors at offices in Saint John, New Brunswick.

Small modular reactors are the next generation of nuclear technology, and the technology can be scaled for designs with an output of between five and 300 megawatts. The units can be constructed and shipped to locations where they are assembled on site.

“Small modular technologies, such as those being developed by ARC and Moltex, are well positioned to provide an important solution to climate change and rising world-wide energy demand,” said Energy and Resource Development Minister Mike Holland.

Small modular reactors have inherent safety characteristics, simpler design, lower cost, ability to recycle their used fuel, and will have superior ability to follow the intermittent variable load from renewable power sources.

Since last year’s announcement, ARC Nuclear and Moltex Energy have achieved major milestones and continue their progress on a number of key initiatives, including

  • established offices in Saint John, New Brunswick
  • met their financial obligations
  • working with the University of New Brunswick (UNB) in order to establish chair positions, curriculum, and plans for research and development to be performed at UNB and the Centre for Nuclear Energy Research
  • progressing their conceptual designs
  • progressing through Phase 1 of the Canadian Nuclear Safety Commission’s (CNSC) Vendor Design Review process
  • pursuing the possibility of establishing a potential supply chain in New Brunswick
  • having discussions within the province to increase the understanding of advanced Small Modular Reactor technologies
  • exploring various investor possibilities

In order to move to commercial demonstration, these technologies would need to successfully complete Phase 2 of the CNSC Vendor Design review and their financial and project planning predictions would need to continue to show promise. If these conditions are met then NB Power envisions commercial demonstrations of both reactor types at the Point Lepreau site with an in-service date of approximately 2030.

New Brunswick Energy Solutions Corporation, a provincial Crown corporation, committed $10 million last year toward the establishment of an advanced Small Modular Reactor Research Cluster in New Brunswick. ARC and Moltex also each invested $5 million to progress research and development of their advanced technologies.

Source

Related Articles


Latest Articles


Changing Scene

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…

  • Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    July 31, 2026 Toronto Pearson has announced contracts to NORR-DIALOG and PCL Construction, who will design and construct another major infrastructure program. The $1.5-billion investment to launch the Terminal 1 and Terminal 3 Revitalization Program has been awarded to NORR-DIALOG, a joint venture between two firms both Ontario-incorporated, and PCL Construction, a global firm created and headquartered… Read More…

  • D.A.D. Sales Welcomes new Team Member – Tom Graham

    D.A.D. Sales Welcomes new Team Member – Tom Graham

    July 31, 2026 D.A.D. Sales announced the addition of Tom Graham as Construction Sales Representative on the D.A.D. Sales team, supporting Northern Alberta. “Tom brings valuable industry experience, a strong understanding of the construction market, and firsthand insight as a skilled tradesman. He understands our customers’ businesses and the realities they face in the field.… Read More…

  • Franklin Empire Opens New Full-Line Branch in Peterborough

    Franklin Empire Opens New Full-Line Branch in Peterborough

    July 31, 2026 Franklin Empire is pleased to announce the opening of their new Peterborough branch, bringing together electrical, automation, and Process Instrumentation expertise under one roof. This new location expands their ability to better serve contractors, industrial facilities, OEMs, municipalities, and commercial customers throughout the Peterborough region with a complete range of products, technical… Read More…