ASCO Technologies’ last Tech Brief indicated that power outages remain an operational condition that will affect temporary facilities as they affect any other facility. Because of the present interest, they wanted to describe common options for getting backup power equipment onsite to mitigate outages at temporary facilities. 

At the heart of a backup power system is a transfer switch that connects load to an alternate power source, which will presumably be a generator. Options for housing these include the following. 

Option 1: Placing Equipment Outside of a Structure 

Critical power equipment such as a transfer switch can be installed on a hard surface or even on skids if sited temporarily. If used, this configuration would most likely be used with a tent-based solution. Note that this approach requires protecting the unit from weather and unauthorized access, and, if vehicles could be present, from accidental vehicular contact. 

Providing two of these protections is a matter of selecting an appropriate enclosure. Specifying a UL50 or NEMA 250 Type 3R enclosure with door-over-door construction can provide weather and access protections. For more information, see our white papers entitled Equipment Enclosure Classifications and Selecting Secure Enclosures. For protection from vehicles, parking bollards can be installed. 

Option 2: Placing Equipment in a Shed or Shipping Container 

Critical power equipment can be placed within a shelter, a shed, or a shipping container. This can provide the three types of security referenced above. While the equipment can be installed into the structure after it is delivered to the site, deployment efficiency may be improved by installing the equipment off-site prior to delivery, particularly where multiple units will be needed. 

Option 3: Pre-Installing Equipment in Modular Structures 

A third option is to install prefabricated building modules pre-fitted with power equipment. In this instance, the critical power equipment is installed together with the remainder of the power distribution system, which uses the same design in successive units. The transfer switch can be located in a compartment or room with other electrical gear. This video at Businesswire gives a sense of the scalability of modular options. 

Advantages of Prefabricated Containerized Equipment 

Constructing facilities utilizing containerized equipment offers the following potential advantages:

  • Installing all electrical equipment onsite can require more labor at the site. Prefabricating the equipment at an off-site workspace can be more efficient. It can also reduce the amount of onsite personnel, which can make for a safer construction environment and help maintain the social distancing practices now needed.
  • In some regions, finding qualified installers can be hard. Reducing onsite labor requirements can reduce problems encountered in tight construction labor markets.
  • After a site is prepared, prefabricated units can be dropped on-site and then quickly connected to power feeds and control systems. Because they are pre-tested, constructors receive functional equipment that streamlines on-site commissioning and testing.
  • Should further expansion become necessary, standardized designs in modular units streamline deployment and connection of additional modules to the temporary facility.

Prefabricating electrical equipment in containers is a practice that’s been around for many years. The current build-out of temporary medical facilities has made it especially relevant now.

Go HERE for more information

Related Articles


Latest Articles

  • Industrial Wiring Devices: A Brief Intro and How to Choose Them

    Industrial Wiring Devices: A Brief Intro and How to Choose Them

    June 9, 2025 Introduction: With the multitude of options on the market, it can be difficult to decide whether you need a pin and sleeve wiring device or a plug and connector in your industrial plant or facility. You might find your head swirling with thoughts about which option is best. Or you may not… Read More…

  • Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    June 9, 2025 By Electro-Federation Canada On June 3 and 4, a high-level delegation from Canada’s electrical and automation sector travelled to Montreal and Quebec City for a series of strategic meetings with Quebec government officials and key stakeholders. Organized by Electro-Federation Canada (EFC), this mission underscores the critical role the industry plays in advancing… Read More…

  • Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    June 9, 2025 By Electro-Federation Canada This year’s Annual Industry Conference, held against the breathtaking backdrop of Niagara Falls, Ontario, was a landmark event with more than 710 Electro-Federation Canada community members. More than just a celebration of our shared history, it was a launchpad for new ideas, future-based dialogue, and deeper connections.   The energy and… Read More…

  • Code Quiz: Canadian Electrical Code, Part 1, 26th Edition Section 28 – Motors and Generators

    Code Quiz: Canadian Electrical Code, Part 1, 26th Edition Section 28 – Motors and Generators

    by William (Bill) Burr Question:  Adam is working in his garage cutting wood on his table saw. Suddenly the lights go out and the sump pump and the table saw stop running. There is obviously a power outage. After a short time, the lights and the sump pump come back on, but thetable saw stays off. Adam needs to restart it.  Can you explain why the lights and sump pump come back on… Read More…


Changing Scene

  • Andrey Goreev Joins Mersen Electrical Power as Regional Sales Manager

    Andrey Goreev Joins Mersen Electrical Power as Regional Sales Manager

    June 9, 2025 MERSEN CANADA TORONTO INC. is pleased to announce effective June 2nd, 2025, Andrey Goreev has joined Mersen Electrical Power as Regional Sales Manager for the Western Canada Region. He will report to Tom Arbanas, Vice President of Distribution Sales and Customer Care, Canada. Andrey has over 18 years of experience in industrial… Read More…

  • Electric Avenue Powers Ahead with Major Win and New Flagship Product: Watti Pro Echo

    Electric Avenue Powers Ahead with Major Win and New Flagship Product: Watti Pro Echo

    June 9, 2025 In an industry dominated by global giants, a startup from Canada’s East Coast is quickly becoming one of the most compelling cleantech success stories in the country. Electric Avenue, a Nova Scotia–based EV charging manufacturer, is making waves in the North American market with the official launch of its Watti Pro Echo… Read More…

  • Manitoba and BC Establish Free Trade Agreements

    June 9, 2025 The Manitoba government will sign a new memorandum of understanding with British Columbia to advance free trade between the two provinces and cabinet will pass regulations by July 1 to ensure mutual recognition of other provinces by Canada Day, Premier Wab Kinew announced today at the MBiz Breakfast Series hosted by the… Read More…

  • Nova Scotia Removing Trade Barriers With Other Provinces, Federal Government

    Nova Scotia Removing Trade Barriers With Other Provinces, Federal Government

    June 9, 2025 Trade barriers between Nova Scotia, several provinces and the federal government will soon be removed. Nova Scotia, along with Alberta, British Columbia, Manitoba, Ontario and Prince Edward Island have taken action to remove barriers and red tape that will open up new trade and investment opportunities. It is also anticipated that the… Read More…