April 8 Deadline for Women of Distinction Awards — Solar

April 8 Deadline for Women of Distinction Awards — Solar

WiRE Women of Distinction Awards recognize and celebrate professional women working in the energy sector who go above and beyond business-as-usual, consistently demonstrate outstanding leadership, and have contributed significantly to the expansion and improvement of the power sector. Nominations for the WiRE Woman of Distinction Award for Solar are open until April 8, 2016.

The Solar award is one of three Women of Distinction Awards that WiRE presents annually: Wind Power, Solar Power and Woman of the Year.

Nominees for the solar award must be a woman working in Canada and stand out as a leader who has contributed significantly to the expansion and improvement of the solar field. This may be demonstrated by the nominee through excellence in such areas as

  • volunteering
  • leadership
  • policy and advocacy
  • technical advancement / research and development
  • project development
  • community engagement and increased adoption of renewable energy technologies
  • being a role model contributing to the advancement of women in the sector

Find out more: www.womeninrenewableenergy.ca/awards/.

Related Articles


Latest Articles

  • Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    April 15, 2024 On July 7, 2023, the United Nations International Maritime Organization (IMO) and its participating maritime countries set their Greenhouse Gas (GHG) emissions strategy to achieve net zero “by or around” 2050. As a result, the shipping industry, including cruise lines, is adopting various strategies to achieve this ambitious goal, including new fuels,… Read More…

  • Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    April 8, 2024 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes, it can seem daunting to quickly find the information you need.  This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B, or the… Read More…

  • Investment in the Residential Sector Declines in January 2024

    Investment in the Residential Sector Declines in January 2024

    April 8, 2024 Investment in building construction declined 0.9% to $19.7 billion in January. The residential sector declined 1.4% to $13.6 billion, while investment in the non-residential sector edged up 0.2% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction fell 0.9% to $12.1 billion in January. Investment in the residential sector declines Investment in residential building construction declined… Read More…


Changing Scene