New All-Electric Niagara Falls Tour Ferries Powered by ABB Enter Service

EIN ABB ferrie 400

Oct 8, 2020

Tour boat passengers will be able to experience one of the wonders of the natural world undisturbed by exhaust fumes, engine noise or vibrations, after a pair of vessels installed with all-electric propulsion from ABB have been approved to enter service on October 6, 2020.

The zero-emission ferries – named the James V. Glynn and the Nikola Tesla, respectively in honor of the Maid of the Mist chairman and the renowned energy pioneer – are the first all-electric vessels built in the US, with power drawn from a high-capacity battery pack supplied and integrated by ABB. In addition to batteries, ABB has supplied a comprehensive integrated power and propulsion solution for the newbuild vessels, including an onshore charging system, enabling sustainable operation with maximum reliability.

“Maid of the Mist has always evolved with the technology, and we are thrilled to open a new page in our company’s history, moving our fleet to zero-emission operation,” said Christopher M. Glynn, President of Maid of the Mist Corp. “Close collaboration with ABB has been instrumental in making this project a success, and we are proud of what we were able to accomplish together.”

“As well as allowing passengers to enjoy the spectacular experience of Niagara Falls and safeguarding the environment, the vessels confirm growing acceptance of all-electric vessel propulsion,” said Juha Koskela, ABB Marine & Ports Division President. “We applaud Maid of the Mist’s decision to move to zero-emission operation and are honored to have worked with this forward-thinking company on implementing the electric power and propulsion solution.”

{youtube}NJIRY9hP75M{/youtube}

James V. Glynn and Nikola Tesla are each powered by a pair of battery packs providing 316 kWh total capacity divided across two catamaran hulls, offering a level of redundancy that helps to safeguard operations. The batteries allow the electric propulsion motors to reach an output of up to 400 kW, with the power setup controlled by ABB’s Power and Energy Management System. They are charged using locally produced hydroelectricity – ensuring that the energy cycle for the operation of the Maid of the Mist ferries is entirely emissions free – in a process that takes just seven minutes during disembarkation and boarding.

Having installed the ship-to-shore battery charging connection, ABB also supplied the Glynn and the Tesla with a comprehensive scope of electric, digital and connected solutions including switchboards, drives and the integrated control system, in addition to the ABB Ability™ Marine Remote Diagnostic System for monitoring and predictive maintenance.

Source

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • Luxxbox Launches Quick Ship Program to Accelerate Project Timelines

    Luxxbox Launches Quick Ship Program to Accelerate Project Timelines

    July 16, 2025 Luxxbox announces the launch of its new Quick Ship Program, designed to provide architects, designers, and project managers in the United States and Canada with expedited access to a curated selection of their most in-demand acoustic lighting products. With a two-week turnaround from order to dispatch, the program ensures that project timelines… Read More…

  • ECS Earns Platinum Status for 8th Consecutive Year in Canada’s Best Managed Companies Program

    ECS Earns Platinum Status for 8th Consecutive Year in Canada’s Best Managed Companies Program

    July 16, 2025 Electrical Cable Supply (ECS), Canada’s largest independently owned wire and cable distributors, is proud to announce its re-certification with the prestigious Platinum designation in Deloitte’s Canada’s Best Managed Companies program for the eighth consecutive year. This announcement recognizes ECS’s sustained excellence in strategy, innovation, culture, and strong financial performance. The Canada’s Best… Read More…

  • Nexans Canada Partners with Skills Compétences Canada to Sponsor WorldSkills Team Canada 2026

    Nexans Canada Partners with Skills Compétences Canada to Sponsor WorldSkills Team Canada 2026

    July 16, 2025 Nexans has announced its partnership with Skills Compétences Canada (SCC), a not-for-profit organization that actively promotes careers in skilled trades and technologies. As part of the partnership, Nexans will sponsor WorldSkills Team Canada 2026 as they prepare to compete at the 48th WorldSkills Competition, taking place in Shanghai, China, from September 22 to 27, 2026. “At Nexans,… Read More…

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…