ESA Issues Notice Regrading Hazards Associated with Raising of Buildings

EIN 24 ESA 400

September 1, 2021

The Electrical Safety Authority (ESA) has seen an increase in the number of buildings, such as cottages, being raised while the electrical supply to the building remained energized. This practice may endanger the public creating shock and/or fire hazards from things such as:

  • the overhead service conductor breaking and falling to the ground or possibly snapping the pole;
  • the service mast being bent or broken;
  • contact between other systems such as communication or primary lines when the sag of the overhead conductor is reduced;
  • service conductor damage when supplied from underground;
  • disconnected/damaged ground wire;
  • exposed/damaged branch wiring below the building

Performing the task of raising a building shall be done with the power disconnected.

Direction:

Contact the Local Distribution Company (LDC) to request the power to be disconnected.

Obtain a notification of work from ESA when replacing/extending ground wires or other electrical alterations.

When hiring a contractor to perform electrical work, they are required to be a Licensed Electrical Contractor.

Raising a building without following the above direction is a violation of the:

Ontario Electrical Safety Code

Rule 2-032 which states no person shall damage or cause any damage to an electrical installation;

Rule 2-304 which states no repairs or alterations shall be carried out on any live equipment except where complete disconnection of the equipment is not feasible; and

The Electricity Act, which does not permit a person to interfere with the LDC’s wiring to the building.

Source

Related Articles


Latest Articles


Changing Scene

  • Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    May 26, 2025 Siemens will invest CAD $150 million over five years to establish a Global AI Manufacturing Technologies Research and Development (R&D) Center for Battery Production in Canada. The new R&D center, located initially at Siemens Canada’s head office in Oakville, as well as in Toronto and Kitchener-Waterloo, Ontario, will focus on developing cutting-edge AI manufacturing technologies with an initial emphasis… Read More…

  • Honda Postponing Ontario EV Supply Chain Investment by Two Years

    Honda Postponing Ontario EV Supply Chain Investment by Two Years

    May 26, 2025 Honda is postponing its plan to invest in a comprehensive EV supply chain in Ontario. The CBC reported that the investment is being push back by two years. “Due to the recent slowdown of the EV market, Honda Motor has announced an approximate two-year postponement of the comprehensive value chain investment project in Canada…. Read More…

  • Serge Leblanc Named Sonepar Canada Interim President

    Serge Leblanc Named Sonepar Canada Interim President

    May 26, 2025 George McClean, former President of Sonepar Canada, has decided to leave Sonepar for an opportunity outside of the electrical industry. Serge Leblanc, current President of Lumen Canada, has been appointed interim President of Sonepar Canada. Leblanc will manage both responsibilities until a successor is named.  Leblanc joined Lumen in 1997 and has… Read More…

  • Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    May 26, 2025 On Monday, May 26, the Ontario Building and Construction Tradeswomen (OBCT), will host its first-ever Advocacy Day at Queen’s Park. Tradeswomen from across the province will gather to meet with Members of Provincial Parliament, including Minister of Labour David Piccini, to advocate for progress in the skilled trades for tradeswomen. OBCT’s top priorities include:… Read More…