Hydro Ottawa to Distribute Funding for Electric Vehicle (EV) Charging Stations

EIN Hydro Ottawa EV Charging Station

October 25, 2021

Hydro Ottawa is pleased to announce that it will soon receive support to help distribute funding to eligible applicants for EV charging stations within the city of Ottawa boundaries.

This funding initiative will provide up to 50% of project costs for the purchase and installation of EV charging stations for:

  • multi-unit residential buildings;
  • light-duty fleets;
  • workplaces;
  • on-street parking; and
  • public places such as retail, restaurants, service stations, medical offices and more.

Private residences, even if a business is registered at the location, are not eligible for this funding.

As part of Canada’s mandate to get to net-zero emissions by 2050, the Government of Canada has set a mandatory target for all new light-duty vehicles and passenger trucks to be zero-emission by 2035. One of the key barriers to zero-emission vehicle (ZEV) adoption is the lack of charging stations. The goal of this initiative is to break down barriers associated with EV adoption by expanding EV infrastructure.

In the coming weeks, Hydro Ottawa will release more information about this initiative, the application process and deadlines.

Quick facts:

  • This initiative provides eligible applicants with funding of up to 50% of the total eligible project costs for the purchase and installation of eligible EV charging stations.
  • Various levels of funding are available for Level 2 and Level 3 chargers.
  • Funding is limited based on the type of charger.
  • Total funding must be less than $100,000 per application.
  • Funding will be available exclusively to eligible applicants for EV infrastructure projects within the city of Ottawa boundaries until February 28, 2022. After this date, funding may be expanded to include projects outside of Ottawa.
  • Eligible applicants do not have to be Hydro Ottawa customers.

Go HERE for more information

Source

Related Articles


Latest Articles

  • Type 2 Chin Strap Hard Hats Required on More Job Sites

    Type 2 Chin Strap Hard Hats Required on More Job Sites

    November 17, 2025 Effective January 1, 2026, all personnel, including subcontractors and visitors to EllisDon and Bird Construction sites, the companies announced, must wear a CSA and/or ANSI Type 2 hard hat with manufacturer-approved integrated (four-point) chin strap, worn according to the specifications, properly adjusted and fastened. The hard hat Class must be appropriate for… Read More…

  • New Research on Smart Home Trends & Technology Adoption

    New Research on Smart Home Trends & Technology Adoption

    September 17, 2025 Sustainability and occupant well-being have become top priorities for smart home consumers, while AI-driven technologies continue to reshape expectations around comfort and convenience. These are among the findings from the latest research by the Association for Smarter Homes & Buildings (ASHB), conducted in collaboration with Harbor Research. The 2025 Smart Home Trends… Read More…

  • Empowering Ontario’s Electric Vehicle Infrastructure with Band-N-Go Solutions

    Empowering Ontario’s Electric Vehicle Infrastructure with Band-N-Go Solutions

    November 17, 2025 By Band-n-Go At Band-N-Go, we are at the forefront of supporting Ontario’s transition to electric vehicles (EVs) by supplying essential products to those enhancing the infrastructure needed for public charging stations. As the number of electric vehicles increases, so does the demand for accessible public charging options. We actively participate as a… Read More…

  • Winnipeg Information Bulletin on Solar Photovoltaic Installations

    Winnipeg Information Bulletin on Solar Photovoltaic Installations

    November 16, 2025 The City of Winnipeg has released a guide to solar photovoltaic (PV) installations and permit requirements for wall mounted, roof mounted and ground mounted installations for both housing and commercial applications. This bulletin attempts to address all scenarios however, solar PV system designs and equipment can vary greatly for each installation, so… Read More…


Changing Scene