PVC Coated Conduit from Atkore Now ETL-Verified and UL 6 Listed

EIN Atkore PVC 400

November 1, 2021

Atkore’s PVC coated galvanized rigid steel conduit has earned ETL Verification while also meeting Underwriters Laboratory (UL) 6 Safety Standards. ETL verification and UL 6 safety listing validates the adhesion of the conduit’s PVC coating and ensures long term system protection in the harshest environments including bridges, tunnels, wastewater treatment, petrochemical and mining.  

During transport, handling or installation, PVC coated conduit may become damaged. Over time, heat and humidity can compromise the adhesive bonding of the PVC-coating causing the coating to fray, peel, and degrade. This can allow moisture to seep in, initiating the corrosion process on both the outside and inside of the conduit.

With Atkore’s special bonding agent, the PVC coated conduit passed the ETL SEMKO High Temperature H2O PVC Coating adhesion test and the UL 6 Listing Standard.   

Intertek’s ETL SEMKO PVC001 test exposes conduit systems to extreme heat and humidity, two proven environmental factors that reduce the effectiveness of PVC coating adhesion and accelerate corrosion. The test involves immersing the PVC coated conduit in 90°C liquid (+/-5°C) at a 95% relative humidity for more than 200 hours. This tests the conduit systems’ adhesion and internal/external coatings to confirm the bond of the PVC coating to the steel substrate.

The UL 6 listing entails a series of four tests simulating real world weathering of PVC coated conduit. A protective coating of zinc must be evenly applied to the exterior surface of the GRC conduit, adhering firmly without any blistering or defects. Although PVC coating does not naturally bond to zinc, Atkore’s bonding agent demonstrated a secure seal between the zinc layer and PVC coating, eliminating chances for corrosion.

“We take pride in supplying the PVC coated rigid conduit market with a solution that is ETL-verified for performance and UL Listed for safety” says Mike Lang, Senior Product Manager of Corrosion Resistant Conduit at Atkore. “Whether you’re a contractor, consultant or design engineer, now there is a choice when it comes to selecting ETL-verified PVC coated conduit.”

Atkore’s ETL-verified PVC coated conduit is available through a network of stocking distributors for their Calbond or Allied Tube & Conduit brands. For more information, visit https://www.calbond.com/pvc-coated-conduit/.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…