Governments of Canada and BC Announce Joint Supply Chain Recovery Working Group

EIN Can BC 400

November 26, 2021

The devastating floods in British Columbia have not only jeopardized and displaced the lives of countless Canadians but have also affected Canada’s supply chain. Ensuring that essential goods reach Canadian households in a timely fashion, and that food, medicines and other critical supplies are accessible to all who need them, is of the utmost priority.

Today, the Minister of Transport, the Honourable Omar Alghabra, the Minister of Emergency Preparedness, the Honourable Bill Blair, and the Minister of Transportation and Infrastructure for the Province of British Columbia, the Honourable Rob Fleming, announced the creation of a joint Federal / Provincial Supply Chain Recovery Working Group to restore the flow of goods through the province. The group is already at work and will be working through the weekend.

Those invited to participate in the Federal / Provincial Supply Chain Recovery Working Group include several Government of Canada departments, Government of British Columbia ministries, the Vancouver Fraser Port Authority, the Vancouver International Airport Authority, the BC Marine Terminal Operators Association, the BC Trucking Association, the Retail Council of Canada, the Canadian Fuels Association, representatives from British Columbia’s tow boat industry, the Gateway Council of BC, the BC Chamber of Shipping, CN Rail, and CP Rail, among others.

This Working Group is a first step in what will be an ongoing effort by all orders of government to ensure that the supply chain is re-established in a way that gets Canadians the goods they need and help mitigate against future incidents.

The Working Group is developing options for contingency transport and logistics for essential goods and materials. As infrastructure gradually reopens, the Working Group will prioritize and advise on the best routes and use of limited capacity for the movement of goods across all transportation modes, while balancing community needs and national economic interest. Furthermore, together they will consider options for diverting traffic or establishing new logistics chains in the province.  

Transport Canada is actively engaging and working with the Province of BC, along with the Port of Vancouver, terminal, railway, air, towing and trucking sectors, to support the response to the flooding in B.C. Of paramount concern is supporting those who are displaced or being evacuated as a result of the landslides.

Both the Government of Canada and Province of British Columbia commend those working in truly difficult or hazardous circumstances who are evacuating people, saving lives, and restoring Canada’s transportation network in a timely fashion.

Quick facts

  • Canada’s total international trade in goods and services in 2020 totaled $1.3 trillion.
  • Beyond the preservation of life, all participants in the supply chain are collaborating to ensure the movement of essential goods, including food and other critical supplies.
  • The Supply Chain Recovery Working Group is working to ensure critical supplies and goods can begin to flow again, and that the supply chain is rebuilt as quickly and as resiliently as possible.

Source

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…