Bird Construction Earns Contract for Phyto Organix Net-Zero Facility

EIN Phyto Bird 400

May 26, 2022

Phyto Organix Foods Inc. has executed a letter of intent to purchase 15 acres of land in the Town of Strathmore, Alberta from the Western Irrigation District as the location of its new, state-of-the-art, net zero emission plant protein processing facility. The $225 million facility will be the largest-ever capital investment in Strathmore and provide a base for Phyto Organix to innovate and grow its plant protein business. When operational in 2024, Phyto Organix will use proprietary wet fractionation technology to annually process 40,000 metric tonnes of yellow peas, grown in close proximity to the facility, into soluble and insoluble protein isolates, processed fibre and starch, and high-quality dietary pea hull fibre.

“Alberta’s food processing sector is a key driver of our economy, and consumer demand for Canada’s responsibly produced plant-based protein is rising worldwide,” said the Honourable Marie-Claude Bibeau, federal Minister of Agriculture and Agri-Food. “This investment in Phyto Organix’s new, net-zero facility supports local growers, protects the environment and increases our capacity to meet global demand for our high-quality, sustainable food.”

Phyto Organix has engaged with technology, construction and engineering leaders in designing its stateof-the-art facility. The Company will employ proprietary, integrated processing technology from SiccaDania A/S and has engaged Bird Construction and GHD Engineering to lead the design and construction of the facility and 3D connectivity to the processing equipment. SiccaDania is a Denmark-based, global leader in protein extraction technologies; Bird and GHD are proven leaders in building food and protein processing facilities in Canada.

Phyto Organix’s 100,000 square foot facility will be the first net zero plant protein processing facility in North America. Key attributes of the plant include:

  • situating it in the yellow pea heartland of Alberta, with annual crop production of over 5 times the facility’s processing capacity grown within 75 kilometres of the facility, minimizing emissions from transporting peas supplied by local farmers;
  • employing industry leading water recycle/reuse technology, allowing the facility to recycle 75% of its process water;
  • industry leading heat integration reducing overall energy consumption and emissions; and
  • powering the facility with low emission energy sources.

Source

Related Articles


Latest Articles


Changing Scene

  • Federal Government Invests $1.2B to Build 84,500 EV Chargers by 2027

    Federal Government Invests $1.2B to Build 84,500 EV Chargers by 2027

    From mining, to manufacturing, to charging, Canadian businesses and workers are attracting historic investments in the electric vehicle (EV) supply chain. When electric vehicles are made from Canadian minerals, assembled by Canadian auto workers, and powered at Canadian-made chargers, we secure and create jobs, grow our economy, and keep our air clean now and into the future. Read More…

  • Applications Open for Nova Scotia Power’s 2023 Scholarship and Bursary Program 

    Applications Open for Nova Scotia Power’s 2023 Scholarship and Bursary Program 

    Applications are now open for Nova Scotia Power’s 2023 Scholarship and Bursary Program, and Nova Scotian students are encouraged to apply. The program is accepting applications until April 19, 2023. As part of its Diversity, Equity and Inclusion strategy, Nova Scotia Power is focused on supporting programs and initiatives that help remove barriers, advance DE&I education and awareness in Nova Scotian communities. Read More…

  • BCUC Approves Deferral Account for FortisBC’s Electric Vehicle Workplace and Fleet Charging Funding Program

    BCUC Approves Deferral Account for FortisBC’s Electric Vehicle Workplace and Fleet Charging Funding Program

    Recently, the British Columbia Utilities Commission (BCUC) approved FortisBC Inc.’s (FBC) application for a new deferral account to enable funding to organizations for the purchase and installation of Electric Vehicle (EV) charging infrastructure. Through FBC’s EV Workplace and Fleet Charging Funding Program, eligible organizations can request a one-time FBC funded contribution of $1,920 per Level 2 EV Charger, capped at seven chargers per site. Read More…

  • Parliamentary Secretary Julie Dabrusin Announces New EV Chargers in B.C. and New Single Window for ZEV Infrastructure Applications

    Parliamentary Secretary Julie Dabrusin Announces New EV Chargers in B.C. and New Single Window for ZEV Infrastructure Applications

    Reducing pollution from the transportation sector is critical to Canada achieving its climate targets. That’s why the Government of Canada is making it more affordable for Canadians to purchase, charge and drive electric vehicles (EV) across the country. Recently, Julie Dabrusin, Parliamentary Secretary to the Minister of Natural Resources and to the Minister of Environment and Climate Change, on behalf of the Honourable Jonathan Wilkinson, Minister of Natural Resources, launched a new, integrated, federal zero-emission vehicles (ZEV) infrastructure landing page. Read More…