Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

April 27, 2026

Toronto Hydro is launching a trailblazing customer pilot project designed to help local builders electrify multiplex housing without complex service upgrades. Through Toronto Hydro’s Multiplex PowerPlay, up to six multiplex projects can qualify to receive funding toward a smart energy load management system.

Smart load management systems continuously monitor total building energy consumption as an alternative to service upgrades by preventing electricity demand from exceeding panel or service limits. These intelligent energy management systems can help buildings support growing electricity needs, including heat pumps and electric vehicle (EV) chargers, without overloading existing electrical capacity.

As part of the Multiplex PowerPlay Program, Toronto Hydro will fund up to $50,000 per project toward the purchase and installation of smart load management devices. With interest growing in electric heat pumps and EV–ready homes, many multiplex projects can encounter complex service upgrade requirements. Toronto Hydro’s new pilot project will provide an opportunity to explore how builders can take a practical path to keep projects moving.

The system dynamically balances building energy consumption levels, allowing customers to adopt new electric technologies faster, more efficiently and more affordably. With only six spots available, the pilot is offering a unique opportunity for developers to become early leaders in exploring the power of this exciting new technology.

Multiplex
Diagram of smart load management system (CNW Group/Toronto Hydro Corporation)

Why join the Multiplex PowerPlay Pilot Program?

Selected projects will benefit from the ability to:

  • Save money: Avoid the need for service upgrades
  • Save time: Reduce added planning and construction steps that come with large service upgrades, helping projects start and finish sooner
  • Build smarter: Support the installation of new electric devices, such as heat pumps, within existing limits
  • Contribute to a local solution: Help shape energy management approaches that can support the different types of housing in Toronto

Multiplex PowerPlay eligibility criteria

Toronto Hydro is selecting six new or existing projects that meet the following criteria:

  • Are located in the “M” postal code area, excluding M0R and M7R
  • Are a multiplex development with four to six units, including garden and laneway suites
  • Are focused on electrification with technologies like electric heat pumps and EV chargers included in the design
  • Have project plans that would require a 400A+ service upgrade which is avoided using a smart load management device

Contractors and developers are invited to express their interest by May 31, 2026 for the opportunity to become part of the Multiplex PowerPlay Pilot Program.

Learn more and submit an expression of interest at torontohydro.com/powerplayprogram.

Source

Related Articles


Latest Articles


Changing Scene

  • Electric Avenue Launches Program Paying Homeowners 13 Cents for Every kWh Charged

    Electric Avenue Launches Program Paying Homeowners 13 Cents for Every kWh Charged

    September 11, 2026 New electricity rebate gives eligible residential drivers on the Electric Avenue network money back for the energy they charge at home, with enrollment open now for all homeowners. Electric Avenue Manufacturing Inc. is introducing the Homeowner Rebate Program, a new electricity rebate that will allow eligible residential EV drivers connected to its… Read More…

  • Luminis Wins Four GRANDSPRIX DU DESIGN Awards

    Luminis Wins Four GRANDSPRIX DU DESIGN Awards

    September 11, 2026  Luminis® has announced its Bellevue Slim, Ellington, and Trilo luminaire families have all received GRANDS PRIX DU DESIGN Awards. Bellevue Slim and Trio were awarded GOLD CERTIFICATION in the Product Design – Lighting/Outdoor Lighting Fixture category. Ellington received GOLD CERTIFICATION in both the Lighting/Outdoor and Lighting/Indoor categories. The GRANDS PRIX DU DESIGN… Read More…

  • Location Selected for New Cape Breton Trades Exhibition Centre

    Location Selected for New Cape Breton Trades Exhibition Centre

    September 11, 2026 The Cape Breton Trades Exhibition Centre, a new hub to promote careers in the skilled trades and support construction training in the region, will open in downtown Sydney in 2027. It will provide hands-on learning experiences for students and jobseekers, showcase a wide range of construction trades and offer space for apprenticeship… Read More…

  • Houle Selected as Electrical and Technology Contractor for New BC Cancer Centre

    Houle Selected as Electrical and Technology Contractor for New BC Cancer Centre

    September 11, 2026 Houle proudly announced they have been selected as the electrical and technology contractor for the new BC Cancer centre at Nanaimo Regional General Hospital. Part of BC’s 10-year cancer action plan, this four-storey facility will expand cancer care for patients in Nanaimo and its surrounding communities. When complete in 2028, the centre… Read More…