14 Best Practices for Lineman Safety, Part 1

July 14, 2016

Wilson M. Yancey, Jr.

Appearing below is an excerpt of a paper presented by Wilson Yancey Jr. at the 2016 Academy of Electrical Contracting’s annual meeting in June: Cultivating Safety through Community: Training and Best Practices of the Electrical Transmission and Distribution Partnership. The academy was established by the National Electrical Contractors Association (NECA) in 1968 to recognize exceptional and outstanding service to the electrical contracting industry.

It was not so long ago that on-job injury and fatality information was held close to the vest by those of us in the electrical transmission and distribution industry. It was considered proprietary information, the kind of thing you didn’t want your competitors to know about your company.

In 2003, executive leadership from our industry decided it was time to take the unprecedented step of joining together to move aggressively toward reducing or eliminating injuries and fatalities.

The best practices that follow were developed by members of a U.S. industry group, the Electrical Transmission and Distribution (ET&D) Partnership. Over time they have become the standard in the industry. The complete best practices, including helpful FAQs, appear online at http://www.neca-neis.org/docs/default-source/powerline/best_practices_with_faq.pdf?sfvrsn=2.

1. Administrative controls

In order to address injuries due to improper job planning and risk assessment, this best practice requires pre-planning to begin at the pre-bid meeting and preliminary job site analysis to include the gathering of all relevant information needed to make a full risk assessment. This also suggests working on de-energized conductors and equipment whenever possible.

2. Pre-use inspection of rubber protective equipment


To avoid injuries due to worn, damaged or contaminated insulating equipment, all uniform components are to be inspected prior to use and removed from service if any defect is found.

3. Job briefings

Held at the project location at the beginning of each work shift, as work tasks or conditions change, and as additional personnel arrive on the job site, this best practice provides a standard methodology for sharing key information including hazards, protective equipment to be used, emergency response information and more.

4. Qualified observer

Injuries caused by unrecognized hazards and changes in work conditions can be offset or eliminated by the use of a qualified observer. These well-informed crew members ensure clearances are maintained, proper equipment is used, and effective cover-up is installed. This best practice also outlines the criteria of a qualified observer.

5. Insulate and isolate safety performance check

To ensure compliance with Isolate and Insulate procedures, this best practice requires a safety review process that includes assurances that company safety rules and proper cover-up procedures are being followed.

6. Cradle-to-cradle use of insulating rubber gloves and sleeves

Insulated gloves and sleeves are proven methods for reducing electrical contact injuries and fatalities. This best practice details the use of such PPE including when it is to be used and the requirements for the gloves and sleeves utilized while working from an aerial platform.

7. Lock-to-lock use of insulating rubber gloves and sleeves

As with the cradle-to-cradle use of insulated gloves and sleeves, the same equipment used while working on pad mounted equipment from prior to unlocking until relocking has been proven to reduce electrical contact injuries and fatalities. 

*****
By communicating these best practices proactively and consistently, our industry will continue to see a trend of decreasing injuries as safety efforts that once were novel become the norm. Effective, trained, empowered leadership will deepen those efforts, which bringing us to our training programs.

Part 2, featuring the remaining 7 best practices, will appear in the August 16 issue of Electrical Industry News Week.


Wilson Yancey is the Vice President of Safety, Health and Environment for Quanta Services, Inc., and was made a fellow of the Academy of Electrical Contracting in 2015. Read the entire paper here: www.necanet.org/docs/default-source/academy-papers-(by-decade)/yancey—june-2016.pdf.

 

 

Related Articles


Latest Articles


Changing Scene

  • Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    May 12, 2025 Hammond Power Solutions (HPS), a leader in dry-type transformers and power quality solutions, is pleased to announce the appointment of Linda Nadeau Sanford as the new Western Regional Sales Manager. Linda will play a key part in driving sales and revenue across the Western Canada region. She will oversee territory management, advance… Read More…

  • Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    May 12, 2025 Electricity Human Resources Canada (EHRC) is proud to announce Susanna Zagar (she/her), Chief Executive Officer of the Ontario Energy Board (OEB), as the recipient of the 2025 Agent of Change Award. This recognition celebrates Ms. Zagar’s remarkable leadership and commitment to diversity, equity and inclusion (DEI) in the electricity sector. Since stepping… Read More…

  • AD Reports Huge Jump in Member Sales Through Three Months of 2025

    AD Reports Huge Jump in Member Sales Through Three Months of 2025

    May 12, 2025 AD reports that member sales in the first three months of 2025 increased 23% to a record $24 billion across the group’s 14 divisions and three countries. AD welcomed over 550 new members in the first quarter through both organic growth and the IMARK Electrical merger. AD members also acquired another 10… Read More…

  • Legrand Introduces Wattstopper i3 Building Management Platform

    Legrand Introduces Wattstopper i3 Building Management Platform

    May 12, 2025 Legrand® has announced the launch of the Wattstopper i3 Platform, a next-generation lighting and building intelligence solution powered by KODE Labs, a global leader of advanced smart building technology.  The partnership positions Legrand to lead the lighting controls industry into a new era of unified experiences, seamless integrations, and data-driven control, making it easier… Read More…