Copper Spot Prices 2009-2014

Shannon Tymosko is a first-year apprentice with IBEW (International Brotherhood of Electrical Workers) Local 105, something she undertook after 10 years working her way up the ranks of a payday loan company.
February 15, 2024 Investment in building construction edged higher, 0.3% month over month to $19.8 billion in December. The residential sector grew 0.3% to $13.8 billion, and investment in the non-residential sector rose 0.3% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction was unchanged (+0.0%; +$5 million) at $12.2 billion in December. Residential investment edges higher Investment…
June 18, 2024 This directive, published May 2, 2024, is being issued by a provincial safety manager pursuant to section 30 of the Safety Standards Act. On September 6, 2022, changes to the Safety Standards General Regulation came into effect that require licensed contractors to publish their company name and Technical Safety BC licence number…
Much media coverage during the last year has focussed on the emergence of robots, artificial intelligence technologies (AI), and the threat this poses to a significant number of Canadian jobs.
July 18, 2023 What if your electrical teacher was the nation’s top electrician? You saw him take home the trophy at the 2022 IDEAL National Championship, now hear his story. Tom Kennedy has been an electrician for 31 years, and he’s been teaching apprentices since 1997. Watch this episode of Wire-to-Wire to get to know this…
Over half of small and medium-sized enterprises (SMEs) struggle to recruit talent and two in five have issues retaining employees, according to new research from Signify, formerly Philips Lighting.
March 21, 2025 Purpose To clarify requirements for installations regarding the number of supply services permitted to be located on one unit of a building consisting of row housing for residential occupancies. Discussion There has been inconsistent application of the 2024 Canadian Electrical Code (CE Code) Part 1, Rule 6-102 regarding type and location where… Read More…
March 21, 2025 Rebate pre-approval letters for the Solar Energy Rebate program are currently on hold as the PEI government conducts a program review to ensure it continues to provide the best possible benefits to the most Islanders. We appreciate your patience. We do expect the program to be operational in the coming weeks. Check… Read More…
March 21, 2025 The purpose of this bulletin is to provide clarity on: Definitions from the BC Electrical Code and Product Standards Electric Vehicle Supply Equipment (EVSE) – A complete assembly consisting of cables, connectors, devices, apparatus, and fittings installed for the purpose of power transfer and information exchange between the branch circuit and the… Read More…
Section 30, as outlined in rule 30-000 Scope, is a supplementary or amendatory section of the code and provides additional and specific requirements for the location, installation, wiring, protection, and control of all lighting equipment. Read More…
March 19, 2025 Mac’s II Agencies Announces Jamie Capell as the New Sales Manager for Lighting Specification Mac’s II Agencies is pleased to announce the expansion of its lighting division with the addition of Jamie Capell as the Sales Manager for Lighting Specification. Jamie brings 25 years of experience in the lighting and electrical industry, most notably… Read More…
March 19, 2025 It is with great excitement that RENO introduce Jean-Claude Lespérance as Vice President of Sales at RENO Lighting. With over 35 years of experience in the Canadian electrical industry, Jean-Claude brings unrivalled knowledge of the market and strong relationship with key industry stakeholders, suppliers, and customers. Holding a college diploma in Electrodynamics… Read More…
March 13, 2025 There is a need and an opportunity for Canada to strengthen energy security and affordability for all Canadians. Canada’s buildings sector is the third-largest contributor to greenhouse gas emissions across the country. By increasing the scale and pace of building retrofits, we can make homes and buildings more energy-efficient and improve reliability in units. The federal… Read More…
March 13, 2025 CBC has reported that BC Hydro is excluding Tesla products from their EV charger incentive program. However, products purchased prior to March 12 will still be eligible. “As of March 12, Tesla chargers, energy storage batteries and inverters are not eligible for rebates, according to B.C. Hydro. Those who have purchased or… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.