Number of power establishments by employment size category and region: December 2015
March 8 2016
The small and micro enterprises form the largest number of electrical workers.
Source: Statistics Canada http://www.servicecanada.gc.ca
March 8 2016
The small and micro enterprises form the largest number of electrical workers.
Source: Statistics Canada http://www.servicecanada.gc.ca
Master electricians in the early stages of their career represent only 6% of all master electricians. See the percentages for master electricians in the mid, experienced and late career categories.
Recently, I had the pleasure of sitting down with David O’Reilly, Vice President Home & Distribution and Secure Power Divisions with Schneider Electric Canada for a discussion regarding the Wiser EnergyTM smart home solution, the Wiser Approved training program, and his thoughts on several different subjects, including sustainability and future technologies currently in the works at Schneider Electric. David has been with the company for five and a half years in his role.
Trevor Tremblay, technical advisor at ESA, takes us through the top five most common defects – and how Licensed Electrical Contractors can be prepared to avoid them in their work.
A new “future ready” circuit breaker from Schneider Electric is described by the company as the next generation of power distribution for the Internet of Things (IoT) era.
The IP protection rating charter or International Protection Standard consists of the letters IP and two numbers. As prescribed by the CEI 6529 standard, the charter classifies the degree of protection of a product against the intrusion of two types of elements in electrical components: solid and liquid particles.
Men are still receiving a substantially higher hourly rate than women in Canada’s power distributon sector.
November 18, 2024 Technical Advisor Diana Madill shares her inspiring career journey from electrician to inspector and how she overcame challenges as a woman in the trade. If you’ve ever wondered about becoming an Electrical Safety Authority (ESA) inspector, Diana Madill has a path she encourages you to follow. From her humble beginnings inspired by… Read More…
November 18, 2024 On November 7th, the YPN Quebec Region hosted its last 2024 event, the YPN Panel discussion. The panel discussion was moderated by Marcos Simard of Wesco, President of the Quebec YPN Committee. Three leaders from the electrical industry, Gilles Motard, VP operation, Lumen, Corinne Galarneau, company VP, Agence Ricard, Stéphanie Santini, VP… Read More…
The Electrical Safety Authority would like to advise that, following robust consultation, the Minister of Public and Business Service Delivery and Procurement has approved the regulatory amendment to adopt the 2024 Ontario Electrical Safety Code (OESC), which comes into effect on May 1, 2025. Read More…
Rule 22-000 outlinesthe Scope of Section 22 and that it amends or supplements the general requirements of the code. It provides specific rules for locations classified as Category 1 (moisture) or Category 2 (corrosive) environments that are significant enough to interfere with normal operation of electrical equipment. Read More…
November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…
November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…
November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…
November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.