Guide to the Canadian Electrical Code, Part I – Instalment 3

Electrical Conductors

William (Bill) Burr

The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. In this article: Section 4. It is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Section 4 – Conductors

The definition of conductor, from Section 0, is a wire or cable, or other form of metal, installed for the purpose of conveying electric current from one piece of electrical equipment to another or to ground.

Section 4 deals with the selection of type, ampacity and installation conditions of insulated conductors. It is a general section and therefore it applies to all conductors supplying lighting, appliances and power circuits. The selection of other conductors, such as for control, grounding, emergency, safety, fire alarms, airport installations, renewable energy, communications, cathodic protection, and others, will be governed by individual sections covering these situations. Individual sections may also apply as general sections, or may have rules that reference or amend Section 4.

For example, Sections

• 6 — Services and service equipment
• 8 — Circuit loading and demand factors
• 10 — Grounding and bonding
• 12 — Wiring methods
• 14 — Protection and control
• 16 — Class I and Class II circuits
• 26 — Installation of electrical equipment

For this reason it is important to compare the rules in Section 4 with the rules governing conductors in the section dealing with your particular installation. For instance, Rule 4-002 requires that the minimum size for all copper conductors, except for flexible cord, equipment wire, or control circuit wire, and cable (which are specifically covered by other sections) is No.14 AWG and No. 12 AWG if aluminum. However, in Section 6, Rule 6-302 Installation of overhead consumer’s service conductors requires that the minimum size for overhead consumer’s service conductors is No.10 AWG copper or No. 8 AWG aluminum. Even though there are amendatory sections and rules later in the code, it is still important that you refer to Section 4 first when selecting and installing any conductor.

Conductor selection factors

When selecting a conductor there are a number of factors to be considered. Because of the complexity of conditions, you need to have a process to determine the correct type and size for your application. The first consideration is to choose the size of conductor you need based on the

• current it will be required to carry
• conditions under which it will be installed
• type of conductor or cable to be used

Rule 4-004 Ampacity of wires and cables contains 7 items each in subrules (1) and (2) covering scenario options each for copper and aluminum that need to be studied and chosen. In addition, there are 21 other factors in the subsequent subrules to be considered.

Although this may seem daunting at first, it is simply a matter of going through the list of options and conditions and choosing the ones that apply to your situation. Rule 4-004 will then direct you to the correct table and correction factor for your situation.In some cases you will be directed to use the IEEE 385 calculation method or the tabulated information tables in Appendix D. The IEEE 385 Standard Power Cable Ampacity Tables contains all pertinent equations and has the electrical/thermal analog circuit and calculation examples in the annex.

Once the right ampacity has been chosen or calculated, the next factor to consider, according to Rule 4-006, is the temperature limitations on the conductor ampacity you have chosen. Where the maximum conductor termination temperature is marked on the equipment, you will have already chosen the minimum size of conductor based on the correct temperature column of tables 1, 2, 3 or 4. Where the maximum conductor termination temperature is not marked on the equipment, the temperature to be used is: 600 C for equipment rated 100 A or less or marked for use with No.1 AWG or smaller conductors, or 750 C for equipment rated more than 100 A or marked for use with conductors larger than No. 1 AWG.

These conditions apply only to the first 1.2 meters of conductor length measured from the termination point of the equipment.One other condition to note when using a single conductor cable with a metal sheath or armour: induced voltages may cause the conductor insulation temperature to exceed its rating. In this case,Rule 4-010 Induced voltages and currents in metal armour or sheaths of single-conductor cables requires you to derate the conductor along with some other procedures to mitigate this situation.

The next important consideration outlined in Rules 4-008, 4-012, 4-014, 4-016, 4-018, 4-020, 4-040 and 4-042 is the selection of the type of insulated conductor, flexible cord, equipment wire or portable power cable. In some cases these rules will specify minimum sizes and ampacities for the various types.

Finally we go back to Rules 4-022, 4-024, 4-026, 4-028, 4-030, 4-032, 4-034, and 4-036, which provide for the use of a common neutral, installation, identification and use of neutral and identified conductors. Rule 4-038 Colour of conductorscovers the colouring of insulated grounding and bonding conductors, and where colour-coded circuits are required.

You will note that Section 4 does not apply to non-insulated grounding or bonding conductors. The use, size and ampacity of these conductors are covered by Section 10, which we will deal with in subsequent instalments.

In the next installment we will explore Section 6 — Services and service equipment.

Read the rest of the instalments in the series:

Part 1: Guide to the CE Code, Part I — A Roadmap (Instalment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I — Instalment 2
Part 3: Guide to the Canadian Electrical Code, Part I — Instalment 3
Part 4: A Road Map to the CE Code, Part 1 — Instalment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Instalment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Instalment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Instalment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Instalment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 — Instalment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 — Instalment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • New Gender Equality Report Card Shows Most Jurisdictions are Failing

    New Gender Equality Report Card Shows Most Jurisdictions are Failing

    November 10, 2025 The Canadian Coalition of Women in Engineering, Science, Trade and Technology (CCWESTT) has just released the first Gender Equality Report Card, which provides comprehensive, evidence-based insight into the state of gender equality across Canada’s provinces and territories in science, engineering, trades and technology (SETT) workplaces. The report draws on 18 participatory research… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i] 26th Edition – A Road Map: Section 46

    Guide to the Canadian Electrical Code, Part 1[i] 26th Edition – A Road Map: Section 46

    November 10, 2025 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendices B and… Read More…

  • Calgary Project Transforms Office Building into Energy Efficient Housing

    November 10, 2025 More than 200 Calgarians now have new homes in Downtown West as the former Dominion Centre office reopens as Dominion Civic Apartments. The former Dominion Centre has been transformed from 100,000 square feet of vacant office space to an energy efficient and climate resilient residential building with 132 modern rental suites. The… Read More…

  • Remembering Katy Shebath, A Kind And Thoughtful Leader

    Remembering Katy Shebath, A Kind And Thoughtful Leader

    November 10, 2025 By Stanpro Katy Shebath played a critical role alongside her brother, David Nathaniel, throughout the last 32 years of Standard Products journey. She remains, with David, the heart and soul of this company. A Driving Force Behind STANDARD When Katy joined STANDARD in 1986, she took on the administration of the company. At… Read More…


Changing Scene

  • A Groundbreaking Return to the Sir Robert Peel Centre for Ellis Don

    A Groundbreaking Return to the Sir Robert Peel Centre for Ellis Don

    November 10, 2025 In a full circle moment, EllisDon has broken ground on the Sir Robert Peel Centre Redevelopment Project, a facility originally constructed by EllisDon in the 1980s. Now, this milestone marks the beginning of a new chapter in Peel Region’s public safety infrastructure. The redevelopment will deliver a modern, high-performance policing hub designed… Read More…

  • BCCA Response to Federal Budget 2025

    BCCA Response to Federal Budget 2025

    November 10, 2025 The BCCA welcomes the federal government’s investments into construction and infrastructure in Budget 2025. The budget includes increasing Canada Infrastructure Bank funding by $10 billion and funding the new Major Projects Office to the tune of $213.8 million over 5 years. The BCCA also supports the government’s investment into the construction workforce,… Read More…

  • Government of Canada Releases Budget 2025

    Government of Canada Releases Budget 2025

    November 10. 2025 Canada faces a rapidly changing and increasingly uncertain world. The rules-based international order and the trading system that powered Canada’s prosperity for decades are being reshaped – hurting companies, displacing workers, causing major disruption and upheaval for Canadians. In the face of global uncertainty, Canada’s new government is focused on what we… Read More…

  • CME: Budget 2025 Delivers Key Gains for Manufacturers Facing Tariff Pressures, but Canada Still Needs Deeper Competitiveness Reforms

    CME: Budget 2025 Delivers Key Gains for Manufacturers Facing Tariff Pressures, but Canada Still Needs Deeper Competitiveness Reforms

    November 10, 2025 Canadian Manufacturers & Exporters (CME) applauds Budget 2025 for recognizing the serious challenges facing Canada’s economy amid ongoing U.S. trade actions and for introducing new incentives to spur investment. “This budget takes meaningful steps to support manufacturers under pressure and acknowledges the critical role our sector plays in Canada’s economic future,” said… Read More…