Five Reasons for Preventive Maintenance

 

October 23, 2016 

Joy Sonn

Keeping electrical distribution equipment at optimum performance levels can be challenging and stressful. Why? Because nothing operates without reliable power. Developing a maintenance strategy for your electrical distribution system is a sound business decision and implementing an electrical preventive maintenance program is a great starting point. Here are five reasons why.

1. Protect people and equipment
Plant managers must ensure the sustainability of their businesses, and with that comes the responsibility to evaluate and adopt all measures technically and economically available to minimize the risk of unwanted events. These events might cause loss of plant assets, but also place workers in danger. Electrical distribution equipment such as circuit breakers and fuse-contactors is designed to minimize the risk and severity of injuries or equipment breakdown. Therefore, the first priority of maintenance is to ensure this role is performed.

2. Maximize your electrical equipment’s uptime
A regularly scheduled preventive maintenance program lessens process disruptions and reduces stress on electrical equipment. It takes less time to have preventive maintenance performed through a scheduled outage than to have emergency repair on electrical equipment.

3. Enhance energy efficiency
Research shows that regularly maintained equipment is more energy efficient. Over time, normal wear and tear causes stress to components that can result in diminishing device energy efficiency. Less wear and tear on the equipment means less wasted energy while it is running. Preventive maintenance can be performed during off-peak business periods.

4. Improve spare parts management
Spare parts alone can add up to half of the total maintenance costs. Substituting preventive maintenance for reactive maintenance helps to reduce the number of faults on complex parts and/or systems. As a result, more money and time can be spent on improving your production process.

5. Optimize total cost of ownership
Plant managers want to keep their facility’s electrical distribution equipment running well for as long as possible, considering the significant costs of any new equipment acquisition (CapEx). Business operations must also be kept running as smoothly as possible at an optimum cost (OpEx). Without maintenance, the potential for unplanned downtime increases.

Reactive (repair) situations can cause both spare parts and labour to be sold at a premium, in addition to the cost of lost productivity. Implementing an electrical preventive maintenance strategy mitigates the risk of unplanned (and costly) downtime. Knowing when a scheduled shutdown will occur enables management to set staffing levels accordingly.

The bottom line is that electrical preventive maintenance helps to reduce Total Cost of Ownership (CapEx + OpEx) and creates more value for your business. In addition, it helps companies meet their legislative and regulatory requirements.

Joy Sonn has 25 years experience in the electrical distribution services industry. She joined Schneider Electric in 1996.

This article was first published as a Schneider Electric blog: http://blog.schneider-electric.com.

 

Related Articles


Latest Articles


Changing Scene

  • ECABC 72nd Annual General Meeting & Conference: Houle Electric Wins Inaugural Innovation Award

    ECABC 72nd Annual General Meeting & Conference: Houle Electric Wins Inaugural Innovation Award

    July 2, 2024 ECABC extends a big thank you to all who attended their Conference & 72nd AGM on June 20–21, 2024 at the picturesque Penticton Lakeside Resort & Conference Centre. “It was a blast seeing everyone there!” The Welcome Reception at Poplar Grove Winery provided a great networking opportunity with an incredible view and… Read More…

  • EECOL Electric Announces Acquisition of Independent Electric Supply

    EECOL Electric Announces Acquisition of Independent Electric Supply

    July 2, 2024 EECOL Electric has announced the acquisition Independent Electric Supply of Toronto (Independent). Independent, with its 40 team members, has been serving customers in the Toronto area market since 1921. “EECOL’s customer-first focus aligns perfectly with our values. This partnership represents the joining of two companies that have both been servicing the electrical… Read More…

  • BC Introducing Rebates for Solar Panels and Battery Storage

    BC Introducing Rebates for Solar Panels and Battery Storage

    For the first time, BC Hydro will provide rebates for the installation of rooftop solar and battery-storage systems, making it easier for people and businesses to generate their own electricity, reduce their energy bills and deliver clean energy back to the electricity grid. Read More…

  • 2024 Call for Nominations CAF-FCA Board of Directors

    2024 Call for Nominations CAF-FCA Board of Directors

    June 28, 2024 The Canadian Apprenticeship Forum is now accepting nominations for its Board of Directors. This is a great opportunity for those who want to be involved in setting the organization’s strategic direction and overseeing its work on behalf of Canada’s apprenticeship community. Review the CAF-FCA Board Member Job Description. For the 2024/2025-year CAF-FCA… Read More…