Lockout Failure Kills One Worker, Injures Another

Electrical Lockout

A general contracting firm and two supervisors have been fined a combined $133,000 after a lockout incident in which one worker died and the other sustained injuries.Lockout is a means of preventing power from being applied to equipment, ensuring it cannot be set in motion.

The two workers, employed by a sub-contractor, were insulating an overhead water pipe in a Toronto Transit Commission (TTC) garage in Concord, ON. It was their first day on the job. The general contracting firm had two site superintendents supervising the project.

The workers were working from a scissor lift — a self-propelled elevating work platform. When an electric eye triggered a partially lowered overhead garage door to open, the door knocked the scissor lift over, causing both workers to fall 20 feet to the concrete floor below.

Here’s what went wrong:

• the two workers disregarded instructions from the supervisors to stay away from the raised overhead door, which was preventing them from insulating the section of pipe passing above it. One of the supervisors had told them that only TTC personnel could operate mechanical equipment, and that he would make arrangements with the designated TTC inspector. Eventually the workers asked a TTC worker to lower it part way.
• the TTC worker did not follow TTC lockout procedures, neither locking out the controls to the door nor consultingthe designated TTC inspector about lowering or locking it out.
• A few minutes after the scissor lift was moved into a position behind the partially lowered door, anotherTTC employee pushed a cart through the open doorway, which triggered an electric eye that caused the door to raise. The door knocked the lift over as it rolled along an overhead track.

This incident highlights the importance of
• ongoing supervision, especially when dealing with new workers and in an unfamiliar workplace
• strict adherence to all safety policies and procedures

The general contracting firm was fined $125,000. The firm’s two supervisors were fined $4,000 each.

Follow these lockout principles
Ontario’s Ministry of Labour advises employers, supervisors and workers to follow accepted lockout principles, including:
• pre-planning for the lockout by identifying all energy sources, switches, etc.
• where lockout is complex, preparing in checklist form a written sequence for equipment access, lockout/tagout, clearance, release, and start-up
• notifying all workers affected by the lockout
• shutting down equipment by normal means, e.g.,turning switches, closing valves…
• isolating equipment from energy sources by disconnecting or blocking the sources of energy
• lockingout and tagging the energy isolating devices by padlock or some other locking device that the worker has control over as well as a tag indicating that the equipment has been shut down
• verifying that all energy sources have been isolated by attempting to cycle the equipment prior to working on it
• releasing equipment from lockout when work is completed
• testing equipment

 

Related Articles


Latest Articles


Changing Scene

  • Piloting New Ways to Make Homes More Energy-Efficient and Affordable

    Piloting New Ways to Make Homes More Energy-Efficient and Affordable

    October 22, 2024  Canada’s buildings sector is the third-largest contributor to greenhouse gas emissions across the country.  We must increase the scale and pace of retrofitting buildings across the country to make them more energy-efficient, increasing savings and reducing emissions. A federal investment totalling $4.3 million has been announced for five projects funded under the Greener Neighbourhoods Pilot Program (GNPP)… Read More…

  • Manitoba Restores 1:1 Apprenticeship Ratio

    Manitoba Restores 1:1 Apprenticeship Ratio

    October 24, 2024 Regulatory changes that restore the 1:1 apprentice-to-journeyperson ratio and modernize training programs will come into effect Oct. 30, Economic Development, Investment, Trade and Natural Resources Minister Jamie Moses announced today. “Restoring the 1:1 ratio supports safe and higher quality training for workers,” said Moses. “All Manitobans deserve to come home safely at… Read More…

  • RESA Power Significantly Expands Its Medium Voltage Power System Supply and Engineering Capability with the Acquisition of Prime Engineering Ltd.

    RESA Power Significantly Expands Its Medium Voltage Power System Supply and Engineering Capability with the Acquisition of Prime Engineering Ltd.

    October 21, 2024 RESA Power, LLC has announced the acquisition of Prime Engineering Ltd. Based in Victoria, British Columbia, Prime is a full-service electrical design, engineering, supply, and services business that has specialized in medium voltage electrical power and control systems, as well as providing electrical field services, since 2010. With the Prime acquisition, RESA Power significantly… Read More…

  • Hammond Power Solutions Appoints Elec-Tech Sales as New Representative in B.C.

    Hammond Power Solutions Appoints Elec-Tech Sales as New Representative in B.C.

    October 21, 2024 Hammond Power Solutions is pleased to announce the appointment of Elec-Tech Sales Ltd. as their new representative for British Columbia, Canada, effective October 15, 2024. For over 40 years Elec-Tech Sales has been representing leading electrical manufacturers in B.C. They have a strong presence with HPS channel partners as well as experience… Read More…