Often, users encounter situations where they find themselves at odds with the rules contained in the Canadian Electrical Code, Part I (the Code).These situations can occur for designers, consultants, installers, inspectors, manufacturers, students, instructors and standards developers alike, and usually result from a misreading, misunderstanding, misapplication or inability to locate the requirement that is needed or relevant to their tasks.

The Code is a comprehensive document. Sometimes, trying to find information quickly can seem quite daunting.Over the next series of articles, I will provide a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook2, but will hopefully provide some help in navigating the Code.

Introductory pages and preface

The first few pages contain the Table of Contents, the names of the main technical committee and sub-committee members, and the all-important information in the preface. Why is the preface so important? Well, the preface, in addition to a list of reference publications, explains how the Code is organized. This arrangement of the outline provides a road map to finding your way. With this tool you can direct yourself to the exact rule or sub-rule that is the subject of your quest.

The first guidepost, indicated in the preface, is that 

• Sections 0 to 16 and Section 26 are general sections that apply to all installations

• all other sections, which apply to specific situations, amend or supplement these general sections.

The usefuleness of this key distinction will become clearer later in our exploration. The preface doesn’t mention this, but Appendix A and C are normative (mandatory), and all the other appendices are informatory (non-mandatory) parts of the Code. The Tables and Drawings pages are also normative. 

Section 0

Moving on to Section 0, we discover the object and scope of the Code, and the definitions of terms contained in the code.

Object

The object states that this Code establishes safety standards for the installation and maintenance of electrical equipment, where consideration has been given to the prevention of fire and shock hazards, as well as proper maintenance and operation.It also notes that the Code addresses the fundamental principles of protection for safety contained in Section 13 of IEC 60364-1, which is the International Electrotechnical Commission (IEC) standard for low voltage installations (1000 volts or less). You can examine these principles in Appendix K.

We are made aware, by the Object statement, that compliance with the requirements of the Code and proper maintenance will ensure an essentially safe installation, as protection against electric shock, thermal effects, over-current, fault currents, and over-voltage will be met.Also noted is that alternatives to the Code that comply with the fundamental principles of IEC 60364-1 may also be used to achieve safe installations, but only if used in conjunction with acceptable means to assess compliance, by the authorities enforcing the Code.This provision is intended for and usually applies to an industrial installation, under a specific safety management program developed with the authority having jurisdiction. Since the Code is adopted into law by each jurisdiction, any amendments or alternatives must also be adopted into law in that jurisdiction.

Scope

As we move to the Scope statement, we discover that basically all electrical work and equipment is covered by the Code with the exception of

• installations employed by a utility in its function as a power or communication utility

• electric railways

• aircraft

• ships that are not connected to a shore supply for more than five months

If you are looking for rules that apply to a mine or quarry, there are additional requirements in CSA M421.

Definitions

Next up are the definitions. The definitions contained in Section 0 are for specific words or terms used in the Code to aid in understanding and interpretation. An ordinary dictionary meaning applies for any word or term that is not specifically defined in Section 0.These definitions apply generally throughout the CE Code. However, some sections also contain definitions that apply to terms used only in that particular section.It is very important that you check these definitions when reading any specific rules.Although you may have a general idea of the meaning of a term, the Code definition can sometimes affect the application of the rule. 

As an example let’s look at the definition of the word Approved(as applied to electrical equipment).It is generally acknowledged that electrical equipment needs to be certified by a certification organization to be approved.But wait! There’s more! According to the definition, that certification organization needs to be accredited by the Standards Council of Canada (SCC), and in addition, the product needs to be certified that it meets the requirements of

• CSA safety standards for electrical products (Part II standards), or

• other standards developed by an SCC accredited standards development organization (SDO) or other recognized documents where CSA Standards do not exist for that product.

In the case of non-CSA standards or other recognized documents, they must be correlated with the Code and also must not duplicate standards listed in Appendix A. The definition also conveys alternatively that equipment meeting the requirements of the regulatory authority is also considered approved. This normally refers to field evaluation by an accredited special inspection body that is recognized by the authority having jurisdiction and facilitates the approval of new or limited manufacture products. So you see, a lot of information is contained in this definition of Approved. The Appendix B note on this definition would also be very beneficial to the Code users.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • G5 Series from Eralux Illuminates the Oshawa Library

    G5 Series from Eralux Illuminates the Oshawa Library

    November 25, 2024 Eralux is proud to present its latest project with the G5 Series at the Oshawa Library to improve the atmosphere and use of public spaces. Located in downtown Oshawa, Ontario, the library is a center for learning and creativity. Now that Eralux’s innovative lighting solution has been introduced, the library experience is… Read More…

  • Ontario Drives Growth in Residential Building Construction in September

    Ontario Drives Growth in Residential Building Construction in September

    November 25, 2024 Investment in building construction rose 2.1% to $21.6 billion in September, following a 0.2% increase in August. The residential sector increased 2.9% to $15.2 billion in September, while the non-residential sector edged up 0.3% to $6.4 billion. Year over year, investment in building construction grew 6.7% in September. On a constant dollar basis (2017=100), investment in building construction increased 1.6% from… Read More…

  • Ontario’s Institutional Construction Intentions Push up the Non-Residential Building Permits in September

    Ontario’s Institutional Construction Intentions Push up the Non-Residential Building Permits in September

    November 25, 2024 The total value of building permits in Canada increased by $1.3 billion (+11.5%) to $13.0 billion in September, reaching the second-highest level since the start of the new series in January 2017. Ontario’s construction intentions grew by $1.2 billion (+25.0%) to $5.9 billion in September 2024, leading gains in both the non-residential and residential sectors. On a constant… Read More…

  • Red Seal Self-Assessment Questions

    Red Seal Self-Assessment Questions

    November 25, 2024 Each trade’s self-assessment tool is available to help you understand your own readiness for challenging the Red Seal exam in that trade. It goes through all topics that are included in the trade’s standard (Red Seal Occupational Standard/National Occupational Analysis) and asks you to reflect on whether you have the experience and knowledge in each… Read More…


Changing Scene

  • EV ChargeON Community Sites Stream

    EV ChargeON Community Sites Stream

    November 25, 2024 Through the EV ChargeON Community Sites Stream, over 1,300 new EV charging ports have been approved at sites across the province. The Ontario government is investing $63 million to help build electric vehicle (EV) charging ports in communities with less than 170,000 people, including Indigenous communities. This will increase access to EV… Read More…

  • ITC Electrical Components Celebrates 30 Years of Service to the Electrical, Automation and OEM Market in Canada

    ITC Electrical Components Celebrates 30 Years of Service to the Electrical, Automation and OEM Market in Canada

    November 25, 2024 Celebrating its 30th anniversary, ITC Electrical Components has recently launched its new and improved website at www.itcproducts.com. After a successful 15-year career in the electrical components industry Luca Fontana founded ITC Electrical Components in 1994.  Since that time the company has grown from a home-based operation to a successful business with 15 employees and… Read More…

  • Eaton Canada Investing $15m to Expand Manufacturing Capacity

    Eaton Canada Investing $15m to Expand Manufacturing Capacity

    November 25, 2024 Eaton Canada is investing approximately $15 million to expand manufacturing capacity to meet growing demand for its electrical solutions driven by the ongoing electrification of Canada’s economy. These investments will expand the company’s low-voltage manufacturing footprint by 20%, increasing its ability to produce the switchboards, switchgear and panelboards needed to support Canada’s… Read More…

  • Bartle & Gibson Announces Partnership with Electric Avenue

    Bartle & Gibson Announces Partnership with Electric Avenue

    November 25, 2024 Bartle & Gibson Co. Ltd., a Western Canada-based premier plumbing, heating and electrical distributor, proudly announced a new regional partnership to distribute Electric Avenue, providers of convenient, affordable and easy-to-use smart charging solutions for residential and commercial use, across Western Canada. Electric Avenue was founded in 2021 with one simple mission: to… Read More…