Guide to the Canadian Electrical Code, Part I — Instalment 8

Wiring Circuits

 

December 6, 2015

William (Bill) Burr

The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Section 14 is a general section of the Code and the Scope applies to all electrical circuits and apparatus installed in accordance with the requirements of the Code unless amended or modified by other sections. As with other sections of the Code, the Appendix B notes contain much valuable information on the use of the rules in Section 14.

Section 14 is divided into three main parts covering general requirements, protective devices, and control devices.

In the General requirements part:

• Rule 14-010 specifies that protective and control devices are required to be provided for electrical apparatus and ungrounded conductors. It provides the most fundamental requirement in the Code: to install control devices in order to manually disconnect all ungrounded conductors of a circuit or to automatically open the circuit if a current in a circuit reaches a value that will produce dangerous temperatures or in the event of a ground fault. The rule is needed to prevent damage or injury due to overloads, short circuits or ground faults, and also hazards caused by a low or no voltage situation. Protective devices include fuses and circuit breakers while control devices include switches as well as circuit breakers.Note that a fuse is not a control device and must be used in conjunction with a switch where control is required.

• Rule 14-012 specifies that protective and control equipment must be selected, in accordance with ratings sufficient for the available fault current and/or for the current level it is required to interrupt, in addition to the voltage involved. This rule is also very important for electrical systems designers and installing contractors, as it mandates that only an O/C device rated for the available fault currentmay be used in an electrical installation.

• Rule 14-014 Series rated combinations provides that adownstream circuit breaker with a lower interrupting rating than the available system fault current level can be used in a series rated combination with a fully rated upstream overcurrent device, such that the upstream breaker opens before the downstream breaker when a high level of fault current is detected. These sub-rules provide the conditions for allowing this arrangement. Note that the downstream breaker is marked with the specific upstream overcurrent device required.

• Rule 14-016 Connection of devices requires thatprotection or control devices shall never be connected in a grounded conductor, with a few exceptions as noted.

The Protective devices part is divided into three divisions:  General, Fuses and Circuit breaker.

The General Rules 14-100 to 14-114 cover

• Overcurrent protection of conductors — requires each ungrounded conductor to be protected by an overcurrent device at the point where it receives its supply and at each point where the size is decreased with the exceptions as outlined in paragraphs (a) to (g). It should be noted that exceptions listed in these paragraphs are commonly used by electrical designers and contractor.
• Ground fault protection — this protective feature is additionally required in circuits rated between 150 and 750 volts and more than 1000 amps and circuits rated 150 volts or less and 200amps or more. The sub-rules provide guidance

• Rating of overcurrent devices — generally the rating should not exceed the allowable ampacity of the conductors, which these O/C devices protect. Note: alternatively consult Table 13
• Location and grouping of overcurrent devices — must be accessible and grouped where practicable
• Enclosure of overcurrent devices — accessible operating handles and to authorized personnel
• Grouping of overcurrent devices at a distribution centre— where a panelboard is required
• Overcurrent devices in parallel— restrictions
• The application of supplementary protectors— not to be used for branch circuit protection

The Fuses Rules 14-202 to 14-212 cover

• Time delay and low melting point fuses — “P” and “D” marking
• Use of plug fuses — limited to 125v line to line or 150v to ground
• Non-interchangeable fuses — can’t use a larger rating
• Fuse holders for plug fuses — must be covered type
• Rating of fuses — note some restrictions
• Fuses and fuse holders — only properly rated shall be used
• Use of fuses — selection of fuses by class

The Circuit breakers Rules 14-300 to 14-308 cover

• Circuit breakers general — must be trip-free type and indicate open or closed
• Construction of circuit breakers — must protect all ungrounded conductors in circuit with some noted exceptions
• Non-tamperable circuit breakers — must prevent alteration of current or tripping time
• Tripping elements for circuit breakers — as per table 25
• Battery control power for circuit breakers — battery monitoring, auto trip on low voltage, or alarm and warning sign

The Control devices part is divided into General, Switches, Protection and control of miscellaneous apparatus, and Solid-state devices.

The General Rules 14-400 to 14-416 cover

• Rating of control devices — suitable for loads to be interrupted
• Disconnecting means required for fused circuits — fuses need control devices with some exceptions
• Control devices ahead of overcurrent devices — OC device must be dead when control device is open
• Location of control devices — must be readily accessible
• Indication of control device positions — ON/OFF positions marked
• Enclosure of control devices — must be metal or other fire resisting material
• Grouping of control devices — must be where practicable
• Connection to different circuits — safety rules for equipment with multiple supplies
• Control devices used only for switching — must disconnect all ungrounded conductors in circuit

The Switches Rules 14-500 to 14-514 cover

• Operation of switches — must be operable without exposing live parts in off position
• Mounting of knife switches — so gravity can’t close
• Maximum rating of switches — more than 600A at 750 V used only for isolating
• Connection of switches — moving blades and contacts to be dead when in the open position with some exceptions
• Rating of general-use ac/dc switches — rating for load and use of T rated switches
• Use and rating of manually operated general-use ac switches
• Manually operated general-use 347 V ac switches
• Manually operated switches in circuits exceeding 300 volts-to-ground

The Protection and control of miscellaneous apparatus Rules 14-600 to 14-612 cover

• Protection of receptacles — proper rating
• Additional control devices not necessary — attachment plugs permitted for portable equipment
• Outlet control from more than one point — only switch ungrounded conductors
• Panelboard overcurrent protection — required with noted exceptions also see table 14-1
• Remote control circuits — must be disconnected simultaneously when the circuit they control is off
• Protection of circuits supplying cycling loads — use “P” and “D” type fuses if used
• Transfer equipment for standby power systems — prevent inadvertent interconnection

The Solid-state devices rules 14-700 to 14-704 cover

• Restriction of uses — not to be used as isolating or disconnection means
• Disconnecting means required — to prevent transfer of energy
• Warning notices required

In the next instalment we will outline Section 16 — Class 1 and Class 2 circuits.

 

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…