Meeting National Building Code of Canada Requirements

Building Code Requirements

 

Pierre McDonald

For an electrical installation, meeting the minimum code requirements is not achieved simply by following the installation requirements of the Canadian Electrical Code Part 1 (CE Code). While electricians might believe that they are responsible just for that part of the installation that meets the CE Code, it might be shocking (no pun intended) to learn that they must also meet certain requirements of the National Building Code of Canada (NBCC). 

Here’s an example: for residential construction, the vapour barrier is an important part of the NBCC requirements, yet it is the electrician who is charged with installing vapour hats around all exterior wall and ceiling outlets. This is a very small example of requirements outside of the CE Code that should be understood by electrical tradespeople.

The CE Code includes an Appendix G, which is an informative appendix that lists requirements related to installations that are not governed by Rules of the CE Code, but are required by the NBCC. CE Code rules that are referenced to the NBCC will have the words “See Appendix G” in brackets associated with them. These references only cover those rules that are part of the fire protection requirements contained within the NBCC so you will not find the reference to the vapour barrier requirement mentioned above. (FYI, see NBCC 9.25.3 for Air Barrier Systems and 9.25.4 for Vapour Barriers.)

The application of Appendix G is stated as follows. It should be noted that the appendix is based on the 2015 edition CE Code and the 2010 edition NBCC:

• G2.1 – The intent of this Appendix is to advise Canadian Electrical Code, Part I users of performance requirements for electrically connected fire-protective equipment required by the National Building Code of Canada.

• G2.2 – Special fire protection requirements, such as use of thermal insulation, fire spread, flame spread requirements for electrical wiring and cables, flame-spread requirements for combustible raceways, and construction of electrical equipment vaults are covered by this Code (e.g., Rules 2-126, 2-128, 2-130, 2-132, 26-354, etc.).

• G2.3 – Provincial and municipal building codes may deviate from the National Building Code of Canada, and users of this list should also check those codes.

Looking into a few examples as to how this appendix will assist, we can begin with the CE Code Rules 2-128 Fire Spread, 2-130 Flame spread requirements for electrical wiring and cables, and 2-132 Flame spread requirements for totally enclosed non-metallic raceways. All mandate that they meet some requirements within the NBCC. While there are also Appendix B notes to these rules, the Appendix G notes refers the reader to several sections, articles and sentences within the NBCC. For example, Rule 2-128, refers the reader to:

• 3.1.9.1.(1) and (2), Fire stopping of service penetrations through fire-rated assemblies of fire separations

• 3.1.9.3., Penetration of fire-rated assemblies or fire separations by wires, cables, boxes, and raceways

• 3.1.13.4., Flame-spread rating for combustible light diffusers and lenses 

• 9.10.9.6., Electrical wiring and boxes and penetrating a fire separation

Rule 2-130 references:

• 3.1.4.3.(1), Wires and cables in combustible buildings

• 3.1.5.18.(1), Wires and cables in noncombustible buildings

• 3.1.5.18.(2) and (3), Wires and cables within plenums of noncombustible buildings or wiring and cables that extend from plenums

• 3.4.4.4.(1)(b), Restrictions on wiring and raceways penetrating an exit enclosure

• 3.6.4.3.(1), Equipment and wiring within plenums

And Rule 2-132 references

• 3.1.5.20., Combustible raceways in noncombustible buildings

• 3.1.5.20.(2), Combustible raceways within plenums of noncombustible buildings

In a nutshell, these references point the code user to requirements that could affect the installation or at least provide additional information for the installation. Details of these references should be fully investigated and understood by the electrical installer to ensure compliance with the CE Code rules. These references include:

• Fire stop requirements that are subjected to the fire test method in CAN/ULC-S115 – Fire Tests for Fire stop Systems
• Requirements for wiring, cables, conduit, outlet boxes and similar equipment that are allowed to penetrate a fire rated assembly under certain conditions
• Information regarding flame spread ratings of combustible light diffusers and lenses, as well as limits on the installation of these products
• Information regarding the FT rating of wires and cables, including optical fibre cables as well as installation requirements in combustible and non-combustible installations

Section 32 and certain rules within Section 32 also have substantial references in Appendix G to the sections, articles and sentences within the NBCC. This stands to reason as Section 32 “applies to the installation of electrical local fire alarm systems, permanently connected carbon monoxide alarms, and fire pumps required by the National Building Code of Canada.” While the rules in Section 32 cover conductors, wiring methods, equipment bonding, electrical supervision, circuitry and over current devices for power supplies, and smoke alarms and carbon monoxide alarms in residential occupancies, the substantial requirements for installating fire alarm systems exists within the NBCC. It is the NBCC which mandates when a fire alarm system must be installed, zoning and annunciation of fire alarm systems, elevator emergency recall (alternate floor recall for elevators), visual signal devices in a fire alarm system, and the mandatory use of CAN/ULC-S524 – Installation of Fire Alarm Systems as per 3.2.4.5, to mention just a few.

The same holds true regarding the rules for Fire Pumps, 32-200 to 32-212. It is the actual reference within Appendix G to the NBCC sentence 3.2.5.18. that mandates the use of NFPA 20 standard – Installation of Stationary Pumps for Fire Protection.In fact, Section 32 has 53 references to requirements in the NBCC. 

For some electrical installers this might not mean too much, while for others these requirements must be clearly laid out. This informative Appendix G first appeared in the 1998 edition CE Code and has provided references to those installers who must understand these requirements to fulfill contractual obligations. I have simplified the NBCC requirements to illustrate a few of the requirements associated with the NBCC that could affect the electrical Installer. It is clear that not all requirements regarding electrical installations are written in the CE Code and can easily be found. Using all the tools available, including the Appendix G references, will provide those answers.


 

Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

Other articles by Pierre McDonald:

2015 CE Code: Changes on “Approved Electrical Equipment” 

Code and Public Safety 

Section 62: Fixed Electric Heating Systems 

Now Available: CAN/ULC Standard on Electric Utility Workplace Electrical Safety

Establishing When the CE Code Becomes Mandatory
 

UL Code Link 

CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories 

Canadian CE Code Changes: Section 20 and More 

Conductor Ampacities and Their Temperature Rating 

Codes and Standards – Provincial Legislation and the Administrative Requirements of the CE Code 

Changes to Section 12 Wiring Methods 

Section 4 Conductors — Changes from the Canadian Electrical Code’s 2009, 21st Edition to the 2012, 22nd Edition 

Related Articles


Latest Articles

  • Building Permits, June 2025

    Building Permits, June 2025

    August 14, 2025 In June, the total value of building permits issued in Canada decreased by $1.2 billion (-9.0%) to $12.0 billion. Ontario’s institutional component (-$1.4 billion) led the decline in construction intentions in June, after driving the growth in May. On a constant dollar basis (2023=100), the total value of building permits issued in June decreased 9.5% from the… Read More…

  • Investment in Building Construction, May 2025

    Investment in Building Construction, May 2025

    August 6, 2025 The total value of investment in building construction decreased by $491.4 million to $21.8 billion in May. Investment in the residential sector fell 3.0%, while the non-residential sector edged down 0.4%. On a constant dollar basis (2023=100), the total value of investment in building construction in May was down 2.3% from the previous month and was up 3.1%… Read More…

  • Ontario Electrical League Welcomes Premier to Highlight Skilled Training Investment

    Ontario Electrical League Welcomes Premier to Highlight Skilled Training Investment

    August 28, 2025 This round of the  Skills Development Fund (SDF) Training Stream will provide $260 million for innovative projects that support the hiring, training and upskilling of workers in manufacturing, health care, construction, automotive and other skilled trades.  Ontario Electrical League will recieve $2,995,000 to help 500 journeypersons, registered apprentices, people residing in remote/rural communities… Read More…

  • ABB Invests in Made in Canada with Installation Products that Electrify Our World 

    ABB Invests in Made in Canada with Installation Products that Electrify Our World 

    August 28, 2025 By Krystie Johnston  ABB recently announced their plan to build a new R&D and manufacturing facility in Canada. It will combine their existing facilities in Iberville and Saint-Jean-sur-Richelieu to increase production capacity and support future growth in key sectors across Canada like utilities, energy, and infrastructure. Michael Shenouda, Canada Region Leader –… Read More…


Changing Scene

  • EB Horsman Introduces Sean O’Brien as New Burnaby Branch Manager

    EB Horsman Introduces Sean O’Brien as New Burnaby Branch Manager

    August 20, 2025 EB Horsman & Son is pleased to announce the promotion of Sean O’Brien to Branch Manager of their Burnaby location, effective August 6, 2025. Sean brings over 15 years of experience in the electrical and lighting industry, with a strong background in sales, technical leadership, project management, and clean energy initiatives. He… Read More…

  • Houle Selected as Electrical and Technology Contractor for the New BC Cancer Centre

    Houle Selected as Electrical and Technology Contractor for the New BC Cancer Centre

    August 25, 2025 Houle are proud to announce they been selected as the electrical and technology contractor for the new BC Cancer centre at the Royal Inland Hospital campus in Kamloops. Located adjacent to Royal Inland Hospital, this five-storey cancer centre will provide people in BC’s Interior with expanded access to cancer care closer to… Read More…

  • Ontario Skilled Training Investment Includes NETCO and IBEW

    Ontario Skilled Training Investment Includes NETCO and IBEW

    August 28, 2025 The Ontario government is investing over $23 million through the Skills Development Fund (SDF) Training Stream to help more than 4,200 people across Mississauga and surrounding areas access better training for in-demand sectors such as construction, health care, transportation, manufacturing, aerospace and the skilled trades. Electrical industry recipients: National Electrical Trade Council (NETCO) Ontario Electrical Industry… Read More…

  • New Solar Lighting Manufacturer, Solvic Joins Contact Delage

    New Solar Lighting Manufacturer, Solvic Joins Contact Delage

    August 25, 2025 Contact Delage are excited to announce the addition of a new trusted partner to their lineup: Solvic, an innovative manufacturer specializing in solar lighting. This new partnership reflects Contact Delage’s ongoing commitment to offering sustainable, high-performance solutions tailored to real-world applications. With Solvic, they’re expanding their range of autonomous solar products—perfect for lighting… Read More…