Q4 Non-residential Building Construction Prices Up 0.6%

 

February 17, 2017 

The Non-residential Building Construction Price Index (NRBCPI) was up 0.6% in the fourth quarter compared with the previous quarter. This was the fifth consecutive quarterly increase and the largest gain since the second quarter of 2014.

Contractors reported quarterly increases in six of the seven census metropolitan areas (CMAs) surveyed. Vancouver (+1.1%) and Montréal (+0.9%) posted the largest advances, which mainly reflected higher material prices for contractors in the architectural and structural trades. The composite index for Edmonton was unchanged in the fourth quarter.

Year over year, the NRBCPI rose 1.6%, with Vancouver (+5.8%) and Toronto (+3.7%) reporting the largest increases. Edmonton (-2.6%) and Calgary (-1.9%) reported the only year-over-year declines.

How construction prices have evolved

As 2017 marks the 150th anniversary of Confederation, we take a look back at an aspect of construction prices in Canada.

Information on wholesale building material prices dates back to 1871. Data collection to produce a non-residential material input price index started in 1926. Back then, prices were collected for materials used in projects such as shipbuilding, bridge building and woodworking plants, projects that differ greatly from construction projects today.

In 1970, Statistics Canada adopted model pricing to measure the price changes of construction projects. Using this approach, representative cost components for each building model are weighted according to their relative importance, and then priced through time. These components include the costs of materials, labour and equipment, and contractors’ overhead and profit.

The model approach was first applied to representative models of an office building and a high school, which were then priced in Montréal, Toronto, Ottawa and Vancouver. A light factory building was subsequently added, and the agency began to publish data for all three models as part of the NRBCPI in 1972.

Source: Statistics Canada, www.statcan.gc.ca/daily-quotidien/170214/dq170214a-eng.htm.

 

Related Articles


Latest Articles


Changing Scene

  • Mac’s II Agencies Strengthens Lighting Division

    Mac’s II Agencies Strengthens Lighting Division

    March 19, 2025 Mac’s II Agencies Announces Jamie Capell as the New Sales Manager for Lighting Specification Mac’s II Agencies is pleased to announce the expansion of its lighting division with the addition of Jamie Capell as the Sales Manager for Lighting Specification. Jamie brings 25 years of experience in the lighting and electrical industry, most notably… Read More…

  • RENO Lighting Announce New Vice President of Sales

    RENO Lighting Announce New Vice President of Sales

    March 19, 2025 It is with great excitement that RENO introduce Jean-Claude Lespérance as Vice President of Sales at RENO Lighting. With over 35 years of experience in the Canadian electrical industry, Jean-Claude brings unrivalled knowledge of the market and strong relationship with key industry stakeholders, suppliers, and customers. Holding a college diploma in Electrodynamics… Read More…

  • Canada Invests in Deep Energy Retrofits for Affordable Housing in Hamilton

    Canada Invests in Deep Energy Retrofits for Affordable Housing in Hamilton

    March 13, 2025 There is a need and an opportunity for Canada to strengthen energy security and affordability for all Canadians. Canada’s buildings sector is the third-largest contributor to greenhouse gas emissions across the country. By increasing the scale and pace of building retrofits, we can make homes and buildings more energy-efficient and improve reliability in units.  The federal… Read More…

  • Tesla Products Excluded from BC Hydro Incentive Program

    Tesla Products Excluded from BC Hydro Incentive Program

    March 13, 2025 CBC has reported that BC Hydro is excluding Tesla products from their EV charger incentive program. However, products purchased prior to March 12 will still be eligible. “As of March 12, Tesla chargers, energy storage batteries and inverters are not eligible for rebates, according to B.C. Hydro. Those who have purchased or… Read More…