In this article: the first of two parts on Section 26 — Installation of electrical equipment. The code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Section 26 is a general section of the code and applies to the installation of all electrical equipment. Appendix B contains important additional helpful notes. This section is divided into a number of parts, with the general rules 26-002 to 26-014 applying to all electrical equipment and additional parts for specific types of equipment.

Specific equipment may need to meet requirements in more than one part, so be sure to read all parts that may apply to your situation. In addition, other supplementary or amendatory sections of the code may apply to the installation of specific equipment so always check those parts.

General

Rule 26-002 requires that, in all cases where a device has an identified terminal or lead, it must be connected to the circuit identified conductor.

Rule 26-004 requires that where any electrical equipment, installed directly over a combustible surface, is open at the bottom or marked to require protection, a 1.6 mm thick steel plate extending 150 mm beyond the edge must be installed to cover the combustible surface. Note that equipment certified after Sept. 30, 1986 requires this protection only if so marked.

Rule 26-006 states that ventilation of enclosures shall not be restricted.

Rule 26-008 outlines the protection needed for electrical equipment from a sprinkler system, while not interfering with the sprinkler protection. The CEC Handbook provides some additional guidance on installing protective shields.

Rule 26-010 specifies that all outdoor installations must be housed in suitable enclosures or surrounded by fencing as per 26-300 to 26-324, and must be bonded to ground.

Rules 26-012 and 26-014 provide the requirements for the installation of dielectric liquid-filled equipment indoors and outdoors. Guidance is given in preventing fire and environmental hazards from leaking or venting liquid. The Appendix B note provides additional guidance.

Isolating switches — see Section 0 – Definitions

Rule 26-100 outlines the permitted location, guarding, marking and accessibility of isolating switches, which are intended only to isolate equipment but not to interrupt current flow.

Circuit breakers — see Section 0 – Definitions

Rule 26-120 concerns indoor installed circuit breakers and requires dielectric liquid-filled circuit breakers to conform to 26-012, and circuit breakers installed in electrical equipment vaults to be operable without opening the vault.

Fuses and fusible equipment

Rules 26-140 and 26-142 outline where fuses must be located and the selection of type of fuses for all fusible equipment using rules 14-200, 14-212(b), Table 1 or 3 and Column 4 of Table 2 or 4 as a guide.

Capacitors

Rules 26-200 to 26-222 provide the requirements for the installation of all capacitors. The rules cover indoor installation of dielectric liquid-filled capacitors (as per 26-012) and the guarding, grounding, conductor sizes and overcurrent protection of capacitors. These rules also cover

• the provision, location and rating of disconnecting means for capacitor feeders and branch circuits
• the rating of contactors
• motor circuit capacitors
• transformers supplying capacitors and drainage of stored charge capacitors

Note that this part does not cover capacitors that are components of factory assembled electrical equipment or surge protectors, which are certified as assembled equipment.

The CEC Handbook has additional guidance on the installation and protection of capacitors.

Transformers

This part contains the requirements for the installation of all transformers. Rules 26-240 to 26-248 specify general requirements, outdoor installations, transformers mounted on roofs, dielectric liquid-filled transformers indoors, and dry-core, open-ventilated transformers. Rules 26-250 to 26-256 cover disconnecting means and overcurrent protection for all transformers. Rules 26-258 outlines determining the conductor size for transformers in conjunction with the rules of Section 14. Rule 26-260 provides for coordination between the connected loads and the rating of the transformer overcurrent and conductor ampacities in accordance with Rule 8-104(5) or (6). The final four rules in this part provide specifications for overcurrent protection of instrument voltage transformers (26-262), marking of transformers (26-264), auto-transformers (26-266) and zero sequence filters (26-268).

Fences

Rules 26-300 to 26-324 outline the requirements for constructing fences to guard electrical equipment installed outdoors. The rules cover clearance between the fence and live electrical equipment, height of fences, use of barbed wire, setting of posts, gates, chain link fabric, the use of wood, material and size of posts, top rails, wood stringers, wood slats and preservative treatment. Table 33 is also referenced in this part.

Electrical equipment vaults — see Section 0 – Definitions

The rules of this part 26-350 to 26-356 provide the general, size, construction and illumination required for electrical equipment vaults. Appendices B and G have additional information regarding electrical equipment vaults.

Cellulose nitrate film storage

Rules 26-360 to 26-366 apply to any areas where cellulose nitrate film is stored (note that generally filmmakers are no longer using cellulose nitrate film; however, there may be storage of archival material). These rules specify that no electrical equipment, other than fixed lighting, may be installed in the film vault. These rules also specify wiring methods, luminaires, and circuits in the film vault.

In the next instalment we will be discussing Section 26 — Installation of electrical equipment.

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA


Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11
Part 12: Guide to the Canadian Electrical Code, Part 1 — Instalment 12
Part 13: Guide to the Canadian Electrical Code, Part 1 — Instalment 13 
Part 14: Guide to the Canadian Electrical Code, Part 1 — Instalment 14
Part 15: Guide to the Canadian Electrical Code, Part I — Instalment 15


William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

 

 

 

 

Related Articles


Latest Articles

  • Light and Life: Discover Innovations at Hong Kong’s Premier Lighting Events This October

    Light and Life: Discover Innovations at Hong Kong’s Premier Lighting Events This October

    October 7, 2024 REGISTER HERE At the end of October, the Hong Kong Trade Development Council will host two major events in the lighting industry: the Hong Kong International Lighting Fair (Autumn Edition) and the Hong Kong International Outdoor and Tech Light Expo. Under the theme “Light and Life,” these fairs will present a wide… Read More…

  • NETCO 2023 Leadership Excellence Award Winner – Geordie Walsh IBEW 625 Halifax, Nova Scotia

    NETCO 2023 Leadership Excellence Award Winner – Geordie Walsh IBEW 625 Halifax, Nova Scotia

    October 7, 2024 Leaders and experts from the electrical industry gathered in Victoria, BC, September 5-6th, at the picturesque Inn at Laurel Point for the annual National Electrical Trade Council (NETCO) educational conference and trade show. As part of the event, NETCO presented their 2023 Leadership Excellence Award to Geordie Walsh of IBEW 625 Halifax,… Read More…

  • EFC: A Captivating Quebec Economic Forecast

    EFC: A Captivating Quebec Economic Forecast

    October 7, 2024 On September 19, nearly 50 members of the Quebec section of the Canadian Electro-federation had the opportunity to attend a highly strategic evening with none other than Valérie Beaudoin, Analyst and speaker specializing in American politics to talk about the issues that the upcoming US election decisions will have on the Canadian/Québec… Read More…

  • BC Hydro: Business Energy Saving Incentives

    BC Hydro: Business Energy Saving Incentives

    October 7, 2024 Get funding for energy-efficient equipment upgrades By focusing on what uses the most energy in your business, you can make energy-efficient upgrades for the greatest impact on savings.  The offer Business customers can upgrade any of the equipment listed below with eligible, energy-efficient models and BC Hydro will provide funding to cover… Read More…


Changing Scene

  • Sonepar Canada and Bullfrog Power Collaborate to Expand Green Energy Access

    Sonepar Canada and Bullfrog Power Collaborate to Expand Green Energy Access

    October 7, 2024 Sonepar Canada has partnered with Bullfrog Power to advance its commitment to sustainability by sourcing renewable energy. This collaboration marks a significant step toward reducing Sonepar’s carbon footprint and supporting a cleaner future for Canada by choosing green electricity for its Canadian operations. Bullfrog Power’s generators supply 100% clean, pollution-free electricity to… Read More…

  • PCL Aims for Zero Incidents Under New Deal with Safety Software Company HammerTech

    PCL Aims for Zero Incidents Under New Deal with Safety Software Company HammerTech

    October 7, 2024 PCL Construction (PCL) has signed a multi-year deal with safety intelligence software company HammerTech to help make job sites safer and boost efficiencies across global operations. PCL, one of the largest construction firms in North America, has built a strong culture of accountability, measurement and innovation – delivering over $10 billion-dollar CAD of annual construction… Read More…

  • Electric Avenue Offers Free EV Charger to Enel X Commercial Customers Following Market Exit

    Electric Avenue Offers Free EV Charger to Enel X Commercial Customers Following Market Exit

    October 4, 2024 In response to Enel X’s recent decision to exit the North American market, leaving over 170,000 EV chargers orphaned, Electric Avenue is stepping up to support affected commercial customers with a limited-time offer. Electric Avenue will provide a free Watti Pro Lite 48A commercial EV charger to every Enel X commercial customer… Read More…

  • Leviton Receives Two Gold Cabling Innovators Awards

    Leviton Receives Two Gold Cabling Innovators Awards

    October 4, 2024 Leviton announced that it was recognized among the best in the Information and Communications Technology (ICT) industry by the 2024 Cabling Installation & Maintenance Innovators Awards. Two Gold Awards were given in recognition of Leviton Network Solutions’ carbon neutrality and sustainability initiatives, and for new Leviton OPT-X™ SDX Splice Modules. The third-party… Read More…