Guide to the Canadian Electrical Code, Part 1 — Instalment 12 

April 6 2016

William (Bill) Burr

The CE Code is a comprehensive document. Sometimes it can seem daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will provide some help in navigating the code. In this article: Section 20 Flammable Liquid And Gasoline Dispensing, Service Stations, Garages, Bulk Storage Plants, Finishing Processes, and Aircraft Hangars.

Scope

Section 20 amends or supplements the general requirements of the code. It provides specific rules for a number of special Class I hazardous locations.

Section 20 uses the Zone classification system, but as with Section 18, additions or modifications to existing systems may use the Division system as in Annex J20 of Appendix J. The special terminology definitions used in Section 18 also apply to Section 20.

This section is divided into seven parts covering

  • gasoline dispensing and service stations
  • propane dispensing, container filling, and storage
  • compressed natural gas refuelling stations, compressors, and storage facilities
  • commercial repair garages
  • bulk storage plants
  • finishing processes
  • aircraft hangars

Although requirements are similar for each facility, there are some differences. So, be sure to check the specific part you are considering. Conversely, there are some common rules that are the same for each location.

Hazardous areas

Each part contains a rule outlining the hazardous areas or locations for which that part applies. Wiring and equipment within the hazardous areas as defined in that part shall conform to Section 18 requirements. Some parts have additional requirements, so check the appropriate rule in that part. Notes in Appendix B, Tables 63 and 64, Diagrams 5 and 6, and the CEC Handbook are very helpful in determining the hazardous areas in various parts.

Sealing

Rules 20-012, 20-038, 20-066, 20-108, 20-208, and 20-412 specify that seals are required in accordance with Section 18, and this includes horizontal as well as vertical boundaries of the hazardous locations. Additional sealing requirements may be contained in specific parts.

Bonding

Rules 20-014, 20-042, 20-070, 20-212, 20-314 and 20-422 require that all metal raceways and all non-current-carrying metal portions of fixed or portable equipment, regardless of voltage are to be bonded to ground in accordance with Section 10.

The following provides more information on specific parts of Section 20.

Gasoline dispensing and service stations

Rules 20-002 to 20-014 apply to electrical apparatus and wiring installed in gasoline dispensing and service stations and other locations where gasoline or other similar volatile flammable liquids are dispensed or transferred to the fuel tanks of self-propelled vehicles. Other areas used as lubritoriums, service rooms and repair rooms, and offices, salesrooms, compressor rooms, and similar locations shall, with respect to electrical wiring and equipment, conform to Rules 20-100 to 20-112, which are in the commercial repair garages part.

Propane dispensing, container filling, and storage

Rules 20-032 to 20-042 apply to locations in which propane is dispensed or transferred to the fuel tanks of self-propelled vehicles or to portable containers, and to locations in which propane is stored or transferred from rail cars or tanker vehicles to storage containers.

Compressed gas and natural gas refuelling stations, compressors, and storage facilities

Rules 20-062 to 20-070 apply to locations in which compressed natural gas is dispensed to the fuel tanks of self-propelled vehicles and to associated compressors and storage facilities. These rules, however, do not apply to vehicle refuelling appliances installed in accordance with CSA B149.1 that do not have storage facilities.

Commercial repair garages

Rules 20-102 to 20-112 apply to commercial garages where vehicles powered by gasoline, propane, or other flammable fuels are serviced or repaired.

Bulk storage plants

Rules 20-202 to 20-212 apply to locations where gasoline or other similar volatile flammable liquids are stored in tanks having an aggregate capacity of one carload or more, and from which such products are distributed (usually by tank truck).

Finishing processes

Rules 20-302 to 20-314 apply where paints, lacquers, or other flammable finishes are regularly or frequently applied by spraying, dipping, brushing, or by other means, and where volatile flammable solvents or thinners are used or where readily ignitable deposits or residues from such paints, lacquers, or finishes may occur.

Aircraft hangars

Rules 20-402 to 20-422 apply to locations used for storage or servicing of aircraft in which gasoline, jet fuels or other volatile flammable liquids, or flammable gases are used, but shall not include those locations used exclusively for aircraft that have never contained such liquids or gases, or that have been drained and properly purged.

In the next instalment: Section 22 – Locations in which corrosive liquids, vapours, or excessive moisture are likely to be present.

The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • Maximizing Excel: Practical Use Cases for Preconstruction

    Maximizing Excel: Practical Use Cases for Preconstruction

    November 8, 2024 By Melvin Newman Excel is a powerful and flexible tool that can enhance efficiency in electrical construction estimating.  Spreadsheets, like those in Excel, consist of a grid of “cells” where each cell can hold various types of data. Originating from mainframe computers in the 1960s and later developed for Apple computers in… Read More…

  • The Non-Residential Sector Declines in All Three Components Despite Sustained Industrial Permit Level

    The Non-Residential Sector Declines in All Three Components Despite Sustained Industrial Permit Level

    November 4, 2024 The total value of building permits in Canada decreased by $858.1 million (-7.0%) to $11.5 billion in August, following a strong July during which construction intentions rose sharply (+20.8%). The residential and non-residential sectors contributed to the decrease in August. On a constant dollar basis (2017=100), the total value of building permits decreased 7.6% in… Read More…

  • A Slight Decrease in Residential Building Construction for August

    A Slight Decrease in Residential Building Construction for August

    November 4, 2024 Investment in building construction edged up 0.2% to $21.0 billion in August, after a 1.6% decrease in July. The residential sector edged down (-0.1%) to $14.6 billion, while the non-residential sector was up 1.0% to $6.4 billion. Year over year, investment in building construction grew 7.2% in August. On a constant dollar basis (2017=100), investment in building construction was… Read More…

  • When a Familiar Door Closes

    When a Familiar Door Closes

    November 4, 2024 By Keith Sones, seasoned utility industry executive Most of the articles I’ve written have been based on personal experiences, many of them occurring decades ago, which eventually translate into helpful life lessons. The years allow the events to marinate in a savoury stew of time and reflection, clarity never coming immediately, or even… Read More…


Changing Scene

  • Ontario Streamlining Pathways for Veterans into Skilled Trades

    Ontario Streamlining Pathways for Veterans into Skilled Trades

    November 8, 2024 The Ontario government is making it easier for Canadian Armed Forces (CAF) members, their spouses and veterans to start careers in the skilled trades. The province is also investing $2.4 million through the Skills Development Fund (SDF) to provide free training for CAF members and veterans in tech and cybersecurity careers. These initiatives… Read More…

  • Electric Avenue Partners with Rexel Atlantic to Expand EV Charging Solutions Across the Region

    Electric Avenue Partners with Rexel Atlantic to Expand EV Charging Solutions Across the Region

    November 8, 2024 Electric Avenue Manufacturing is pleased to announce a new distribution partnership with Rexel Atlantic. This strategic alliance will bring Electric Avenue’s advanced EV charging solutions to a broader audience, delivering convenience and quality to residential, commercial, and industrial sectors throughout the Atlantic region. Through this collaboration, Rexel Atlantic will offer Electric Avenue’s full… Read More…

  • BJ Take Rebrands as BJ Take Lighting

    November 8, 2024 BJ Take is an acronym chosen by the company’s founders, so they would not lose focus of why they were starting their company. The name stands for the Buma familt name and Ed and MaryAnn Buma’s five children. Now in its second-generation of family ownership, BJ Take has rebranded to BJ Take… Read More…

  • Government of Canada Invests $10.45M to Accelerate Residential Construction in Quebec

    Government of Canada Invests $10.45M to Accelerate Residential Construction in Quebec

    November 8, 2024 To better meet the evolving needs of all regions across the country, the Government of Canada yesterday launched the Regional Homebuilding Innovation Initiative (RHII). Delivered by Canada’s regional development agencies (RDAs), the RHII supports manufacturers in the residential construction sector in order to accelerate innovation in this industry and transform how homes will be built in the future. The federal government… Read More…