What Is Dark Fibre?

April 25 2016

Luis Cardenas

You surely have heard the term “dark fibre” and wondered what it is about. The term refers to optical fibre infrastructure that hasn’t been lit yet, meaning it has been installed but isn’t being used.

As we know, fibre optic cables are made of thin strands of glass or plastic through which data move as light pulses, caused by LED transmitters if the cable is multi-mode, or a much more sophisticated technology if it is single-mode. Dark fibre is called that because it isn’t active and there are no light pulses travelling through it.
Back in the 1990s, companies installed fibre optic infrastructure all over North America, especially in places with high-bandwidth demand, with the hope that demand would keep growing. But at the time it didn’t and the cost was many bankruptcies.

Nevertheless, the demand has grown since 2009 due to video streaming and smartphones — back in 2011, AT&T an 8,000% growth in mobile data demand — and the telecom industry started laying fibre optic networks again where they were needed as well as putting dark fibre use by leasing it to clients.

What it’s for

Nowadays, telecoms rent dark fibre to local broadband and content providers, healthcare institutions, government agencies and businesses that need to control their own network, so instead of leasing a service they lease an infrastructure that allows them to build their own network with their own equipment.

Leasing dark fibre offers a lot of benefits to the end user, for example avoiding spending time and capital in the construction, development and maintenance of their network. Also, in contrast with renting a bandwidth service, dark fibre provides low latency with very high throughput.

According to Arch Fiber Network, dark fibre gives clients the capacity to increase bandwidth as needed without paying any monthly additional cost and to upgrade the equipment at a time convenient them.

The report Dark Fibre Lease Considerations says dark fibre providers price it per strand per mile and in a set period. Usually, they give the client the Indefeasible Right of Use (IRU) for 20 years in a one-time payment, along with annual payments for operation and maintenance. Customers can also rent fibre for one, two or three years, making monthly payments with the option of leasing the infrastructure for another 20 years once the initial term is over.

Disadvantages

There are thousands of miles of dark fibre deployed across the country, and it still isn’t everywhere because it is only available where companies installed it or where they got permission to do it. Not all hospitals or businesses have access to dark fibre.

When dark fibre covers long distances it needs amplifiers, and those amplifiers need maintenance, which means spending more money. Furthermore, when long-haul dark fibre is exposed to accidental damage, it must be repaired by the company that leases the fibre, so reparations might take time.

Substituting

Wavelength services are an alternative where companies don’t want to lease an entire fibre optic infrastructure, because this allows them to buy a specific wavelength of an existing fibre from a service provider for their exclusive use.

This method is known as Wavelength Division Multiplexing (WDM), and it transmits several wavelengths over a fibre optic, which means data traffic is shared, but each wavelength has a specific laser with a specific colour. Thus, clients can get service from 1GBps up to 100GBps.

Renting dark fibre might be a solution to many businesses high-bandwidth demand, but being clear about its advantages and disadvantages is the best way assure a good decision is being taken.


Luis Cardenas is an economist and CFO of Beyondtech, Inc. This article first appeared as a blog. Source: Beyondtech, http://beyondtech.us/.

 

Related Articles


Latest Articles

  • Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    By Luc Rodier, Chair of the Board of Electro-Federation Canada (EFC) The 2025 EFC Conference in Niagara was a landmark occasion—marking 30 years of innovation, collaboration, and collective progress in the Canadian electrical industry. Set against the symbolic backdrop of the Canadian-U.S. border, this year’s theme, Electrifying Connections, couldn’t have been more fitting. As President and… Read More…

  • Industrial Wiring Devices: A Brief Intro and How to Choose Them

    Industrial Wiring Devices: A Brief Intro and How to Choose Them

    June 9, 2025 Introduction: With the multitude of options on the market, it can be difficult to decide whether you need a pin and sleeve wiring device or a plug and connector in your industrial plant or facility. You might find your head swirling with thoughts about which option is best. Or you may not… Read More…

  • Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    June 9, 2025 By Electro-Federation Canada On June 3 and 4, a high-level delegation from Canada’s electrical and automation sector travelled to Montreal and Quebec City for a series of strategic meetings with Quebec government officials and key stakeholders. Organized by Electro-Federation Canada (EFC), this mission underscores the critical role the industry plays in advancing… Read More…

  • Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    June 9, 2025 By Electro-Federation Canada This year’s Annual Industry Conference, held against the breathtaking backdrop of Niagara Falls, Ontario, was a landmark event with more than 710 Electro-Federation Canada community members. More than just a celebration of our shared history, it was a launchpad for new ideas, future-based dialogue, and deeper connections.   The energy and… Read More…


Changing Scene

  • Eaton and Siemens Energy Partner to Provide Power and Technology to Accelerate New Data Center Capacity

    Eaton and Siemens Energy Partner to Provide Power and Technology to Accelerate New Data Center Capacity

    June 13, 2025 Eaton, and Siemens Energy have announced a fast-track approach to building data centers with integrated onsite power. They will address urgent market needs by offering reliable grid-independent energy supplies and standardized modular systems to facilitate swift data center construction and deployment. The collaboration will enable simultaneous construction of data centers and associated… Read More…

  • Latest Social Media Challenge Puts Students at Risk of Electrical Shock

    Latest Social Media Challenge Puts Students at Risk of Electrical Shock

    June 13, 2025 The Electrical Safety Authority (ESA) is warning Ontarians that a shocking new social media trend is putting students at risk of serious electrical injury including shock, burns or even fires. A pair of dangerous social media trends have been gaining interest from students. One has kids “challenging” each other to stick a… Read More…

  • Plan Group Announce New VP of Electrical

    Plan Group Announce New VP of Electrical

    June 13, 2025 Plan Group are proud to announce the promotion of Dave Scott as Vice President of Electrical. Dave has been a key part of Plan Group’s success for the last 16 years, leading with drive, accountability, and a deep understanding of what it takes to get the job done right. He will now… Read More…

  • Electro-Federation Canada Announces New Chair and Board of Directors for 2025-26

    Electro-Federation Canada Announces New Chair and Board of Directors for 2025-26

    June 13, 2025 On Monday, May 26, 2025, Electro-Federation Canada (EFC) held its Annual General Meeting, which included an update on key initiatives, the welcoming of a new Chair, and the election of the 2025-2026 Board of Directors. EFC President & CEO Carol McGlogan shared key highlights from the past year and provided a summary of the… Read More…