NEMA Publishes Standard For Control, Thermocouple Extension, and Instrumentation Cables

Nema 2015

 

The National Electrical Manufacturers Association (NEMA) has published ANSI/NEMA WC 57/ICEA S-73-532-2014 American National Standard For Control, Thermocouple Extension, and Instrumentation Cables. This standard applies to materials, construction, and testing of multiconductor control, thermocouple extension, and instrumentation cables rated up to and including 125°C. Users and producers of insulated cable will find this standard useful.

Control cables are multiconductor cables that convey electrical signals used for monitoring or controlling electrical power systems and their associated processes. They convey signals between devices interfaced directly with the electrical power system, such as current transformers, potential transformers, relays, switches, and meters.

Instrumentation cables and thermocouple extensions are multiconductor cables that convey low energy electrical signals (circuits which are inherently power limited) used for monitoring or controlling electrical power systems and their associated processes.  Both convey signals from process monitors to process analyzers (usually electronic equipment), and from the analyzers to control equipment in the electric power system.

Construction details and test requirements for cables rated above 125°C can be found in the NEMA HP-100 series of standards.

The National Electrical Manufacturers Association (NEMA) represents nearly 400 electrical, medical imaging, and radiation therapy manufacturers.The combined industries account employ 400,000 people in7,000 facilities. The industry is at the forefront on electrical safety, reliability, resilience, efficiency, and energy security.

Download or order a hard copy of ANSI/NEMA WC 57/ICEA S-73-532-2014 (US$146) here: http://www.nema.org/Standards/Pages/Standard-for-Control-Thermocouple-Extension-and-Instrumentation-Cables.aspx.

 

Related Articles


Latest Articles


Changing Scene

  • Thermon Expands Electric Heater Offering Through Aquisition of F.A.T.I.

    Thermon Expands Electric Heater Offering Through Aquisition of F.A.T.I.

    October 25, 2024 Thermon has announced the acquisition of Fabbrica Apparecchiature Termoelettriche Industriali S.r.L. (F.A.T.I.), a manufacturer of electric heaters for industrial applications, based in Milan, Italy. F.A.T.I. is a leading designer and manufacturer of electrical heaters and heating systems for a broad range of industrial end markets, including oil & gas, pharmaceutical, renewables, nuclear… Read More…

  • CDM2 Partners with ELEC-TECH Sales to Expand Emergency Lighting Solutions Across BC

    CDM2 Partners with ELEC-TECH Sales to Expand Emergency Lighting Solutions Across BC

    October 25, 2024 CDm2 LIGHTWORKS is pleased to announce a strategic partnership with Elec-Tech Sales to bring ABB LUMACELL emergency lighting products and systems into their diverse application-driven solutions. “This partnership with Elec-Tech Sales strengthens our ability to deliver a robust portfolio of integrated lighting, controls, and electrical solutions,” noted Darren Luce, President + Principal of CDm2 LIGHTWORKS. “Together,… Read More…

  • Manitoba Government Introduces Legislation to Help Build New Housing Faster

    Manitoba Government Introduces Legislation to Help Build New Housing Faster

    October 25, 2024 The Manitoba government has introduced amendments to the Planning Act and the City of Winnipeg Charter Act that would change the appeals process for zoning changes by removing a requirement that made it difficult for municipalities to change local zoning bylaws and allowing faster new housing construction, Municipal and Northern Relations Minister… Read More…

  • Piloting New Ways to Make Homes More Energy-Efficient and Affordable

    Piloting New Ways to Make Homes More Energy-Efficient and Affordable

    October 22, 2024  Canada’s buildings sector is the third-largest contributor to greenhouse gas emissions across the country.  We must increase the scale and pace of retrofitting buildings across the country to make them more energy-efficient, increasing savings and reducing emissions. A federal investment totalling $4.3 million has been announced for five projects funded under the Greener Neighbourhoods Pilot Program (GNPP)… Read More…